NASA AMASE 2008: Preparation to go aboard ship (August 1 to 4)
August 7, 2008 / Written by: Jason Feldman: Almost all the AMASE team with their boxes of instruments and gear and tools and such assembled in Longyearbyen in a big conference room at the Radisson and unpacked equipment and started assembling the instruments and running tests. We all worked very hard in Longyearbyen – making sure everything was in place and taking care of last minute technical and logistical crises trying to get everything up and running and ready for the field.
Full report
August 7, 2008 / Written by: Jason Feldman: Almost all the AMASE team with their boxes of instruments and gear and tools and such assembled in Longyearbyen in a big conference room at the Radisson and unpacked equipment and started assembling the instruments and running tests. We all worked very hard in Longyearbyen – making sure everything was in place and taking care of last minute technical and logistical crises trying to get everything up and running and ready for the field.