Space Shuttle Program Requirements Control Board Minutes 6 July 2000

By SpaceRef Editor
July 6, 2000
Filed under

 ( ) Preliminary
( ) Revision 1
07/06/2000 12:52 PM (X) Final

AGENDA
SSP PRCB
JULY 6, 2000

BLDG 1, ROOM 602
10:00 A.M. – 5:00 P.M.

ITEM CR/PRCBD OPR TITLE/ACTION DESCRIPTION
===============================================================================

1 S061417R1 WALK-ON ACTION – GFE HARDWARE
JSC-EA

JSC-EA/1-1 DEVELOP A PLAN AND SCHEDULE TO REVIEW ALL EA GFE
HARDWARE CERTIFICATION FOR ALL ENVIRONMENTS.
REPORT TO THE PRCB.

CLOSED W/ACTION

PRESENTER(S): JSC-EA/M. JANSEN

——————————————————————————-

2 S062139 STS-101 IN-FLIGHT ANOMALY
MSFC-RSRM

MSFC-RSRM/5-1 DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION
FOR THE RH SAFE AND ARM DEVICE INCOMPLETE CYCLE
AND MOTOR DAMAGE. CLOSURE OF THIS ANOMALY IS A
CONSTRAINT TO STS-106 LAUNCH. REPORT RESULTS TO
THE PRCB.

CLOSED W/MOD

PRESENTER(S): THIOKOL/T. BOARDMAN

——————————————————————————-

4 S072107C ADD LONESTAR / REMOVE TRIANA AND UPDATE
JSC-MT STS-107 LAUNCH DATE

APPROVED W/MODS

PRESENTER(S): JSC-MT3/P. WATSON

——————————————————————————-

FOR QUESTIONS ABOUT ITEMS ON THIS AGENDA, CONTACT J. REVIS 281-483-1299

+=============================================================================+
| ITEMS DELETED SECTION ITEMS DELETED SECTION ITEMS DELETED SECTION |
+=============================================================================+
07/06/2000 12:52 PM

ITEMS DELETED FROM
SSP PRCB AGENDA
JULY 6, 2000

CR/PRCBD OPR TITLE/ACTION DESCRIPTION
===============================================================================

S060341R4 PROGRAM WIRE INSPECTION STATUS
JSC-MV

USA/4-1 DESCRIBE THE FOLLOW-ON PLAN FOR PROTECTION AND
JSC-MV/4-2 VERIFICATION OF WIRE INTEGRITY IN THE AFT
COMPARTMENT. SPECIFICALLY ADDRESS MODIFICATIONS
REQUIRED. REPORT TO THE PRCB.

RESCHEDULED TO 06/29/00 SSP PRCB

PRESENTER(S): USH-OE/D. WHITE

——————————————————————————-

S060341R5 PROGRAM WIRE INSPECTION STATUS
JSC-MV

JSC-MV/1-1 REVIEW INDUSTRY EXPERIENCE WITH ARC TRACKING,
INCLUDING TESTING AND SUSCEPTIBILITY OF KAPTON
WIRING TO ARC TRACK. INITIATE TEST PROGRAM, AS
REQUIRED, OR COMBINE TESTING WITH INDUSTRY AND
OTHER GOVERNMENT TEST PROGRAMS TO DEFINE
SUSCEPTIBILITY.

RESCHEDULED TO 6/29/00 SSP PRCB

USA/1-2 REVIEW INDUSTRY EXPERIENCE WITH ARC TRACKING,
INCLUDING TESTING AND SUSCEPTIBILITY OF KAPTON
WIRING TO ARC TRACK. INITIATE TEST PROGRAM, AS
REQUIRED, OR COMBINE TESTING WITH INDUSTRY AND
OTHER GOVERNMENT TEST PROGRAMS TO DEFINE
SUSCEPTIBILITY.

RESCHEDULED TO 06/29/00 SSP PRCB

JSC-MV/2-1 CONDUCT INDEPENDENT LABORATORY TESTING OF OV-102
USA/2-2 WIRE SAMPLES. REPORT RESULTS OF ALL LABORATORY
TESTING TO THE PRCB.

RESCHEDULED TO 06/29/00 SSP PRCB

PRESENTER(S): USH-OE/D. WHITE

——————————————————————————-

S060341R6 PROGRAM WIRE INSPECTION STATUS
JSC-MV

JSC-MV/1-1 REPORT TO THE PRCB ON THE SPEC CLARIFICATION TO
USA/1-2 INCORPORATE ORIGINAL INSPECTION CRITERIA,
REVISED INSPECTION REQUIREMENTS, TEMPORARY WIRE
PROTECTION, AND TRAINING ACTIVITIES, ALL OF
WHICH WERE STATUSED AT THE NOV. 17, 1999 PRCB.

RESCHEDULED TO 06/29/00 SSP PRCB

JSC-MV/2-1 REPORT TO THE PRCB ON THE RESULTS OF GSE
MODIFICATIONS TO REDUCE MECHANICALLY INDUCED
DAMAGE AT KSC AND PALMDALE.

DEFERRED TO 06/29/00 SSP PRCB

USA/2-2 REPORT TO THE PRCB ON THE RESULTS OF GSE
MODIFICATIONS TO REDUCE MECHANICALLY INDUCED
DAMAGE AT KSC AND PALMDALE.

RESCHEDULED TO 06/29/00 SSP PRCB

JSC-MV/3-1 REPORT TO THE PRCB THE STUDY RESULTS AND
USA/3-2 RECOMMENDATIONS FOR DESIGN CHANGES TO MINIMIZE
SINGLE WIRE CRIT 1/1 FUNCTIONS.

RESCHEDULED TO 06/29/00 SSP PRCB

JSC-MV/4-1 REPORT TO THE PRCB ON THE RESULTS OF EFFORT TO
USA/4-2 CONVERT TECHNICIAN JUDGEMENT OF SPEC
REQUIREMENTS TO ENGINEERING REQUIREMENTS.

RESCHEDULED TO 06/29/00 SSP PRCB

PRESENTER(S): USH-OE/D. WHITE

——————————————————————————-

S060341R7 PROGRAM WIRE INSPECTION STATUS
JSC-MV

JSC-MV/1-1 REVIEW THE RCN TO DOCUMENT CRIT 1/1 WIRE
HARNESS INSPECTION CRITERIA IN OMRSD AT THE
PRCB.

PROCESSED OSB

PRESENTER(S): USH-OE/D. WHITE

——————————————————————————-

S061035A SPACE SHUTTLE EXTERNAL RF ENVIRONMENT
JSC-MS

JSC-MS/2-1 SUBMIT CR(S) TO UPDATE SL-E-0001, SL-E-0002 AND
APPLICABLE PAYLOAD AND MIDDECK DOCUMENTS TO
REFLECT THE RESULTS OF THE INTERNAL RF
ENVIRONMENT (BNA PHASE 3) STUDY, REPLACING THE
1V/M SUSCEPTIBILITY REQUIREMENT. AT THE SAME
TIME SUBMIT CR TO UPDATE NSTS 07700, VOLUME X,
BOOK 2, APPENDIX 10.10 TO CHANGE THE R.F.
ENVIRONMENT DEFINITION. REPORT TO THE PRCB.

DEFERRED TO 10/26/00 SSP PRCB

PRESENTER(S): JSC-MS2/G. HOLT

——————————————————————————-

S061481 REVIEW OF SIAT SHORT TERM RECOMMENDATIONS
JSC-MA RESPONSES

JSC-MA/1-1 CONDUCT AN AUDIT OF THE NSTS 07700, VOLUME XI,
SYSTEM INTEGRITY ASSURANCE PROGRAM PLAN (SIAPP)
REQUIREMENTS, AND THE PROGRAM ELEMENT SIAPP
IMPLEMENTATION PLANS. DETERMINE THE ADEQUACY OF
THE PROGRAM REQUIREMENTS REGARDING AGING AND
SURVEILLANCE. DEVELOP A RECOMMENDATION
REGARDING THE STATUS OF SIAPP IMPLEMENTATION
PLANS AND THEIR VALUE ADDED. REPORT RESULTS TO
THE PRCB.

DEFERRED TO 07/20/00 SSP PRCB

PRESENTER(S): JSC-MA/W. HARRIS

——————————————————————————-

S062139 STS-101 IN-FLIGHT ANOMALY
MSFC-SRB

MSFC-SRB/4-1 DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION
FOR THE APU GEAR BOX CONTAMINATION WITH
HYDRAZINE AND SEAWATER, AND IF THIS ANOMALY
SHOULD BE DOCUMENTED AS A PROGRAM IFA. CLOSURE
OF THIS ANOMALY IS A CONSTRAINT TO STS-106
LAUNCH. REPORT RESULTS TO THE PRCB.

DEFERRED TO 07/13/00 SSP PRCB

PRESENTER(S): MSFC-SRB/D. WOOD
USK-GO/S. GORDON

——————————————————————————-

S062141 STS-103 IN-FLIGHT ANOMALIES REVIEW
JSC-MV

JSC-MV/9-1 DETERMINE THE ROOT CAUSE AND CORRECTIVE ACTION
FOR THE STS-103 CAMERA A PAN/TILT CABLE
INTERFERENCE (MER-19). REPORT RESULTS TO THE
PRCB.

DEFERRED TO 08/03/00 SSP PRCB

PRESENTER(S): JSC-EV/B. EMBREY

——————————————————————————-

S071024GA MATERIAL SUBSTITUTION REQUEST (MSR) PROCESS
JSC-MG DOCUMENTATION CHANGE

DEFERRED TO 07/13/00 SSP PRCB

PRESENTER(S): USH-OE/L. WARD

——————————————————————————-

S071219T APPROVE SHUTTLE OBSERVATION CAMERA
JSC-MS IMPLEMENTATION ON STS-97, 98, 102, 100 & 104

DEFERRED TO 08/17/00 SSP PRCB

PRESENTER(S): JSC-MS2/R. ADAMS

——————————————————————————-

S071301 BASELINING SHUTTLE ENVIRONMENTAL ASSURANCE
MSFC-MP01 INITIATIVE PROGRAM PLAN

DEFERRED TO 07/27/00 SSP PRCB

PRESENTER(S): MSFC-MP71/A. MURPHY

——————————————————————————-

S072108 ADD STS – 108 TO FDRD
JSC-MT

WITHDRAWN

PRESENTER(S): JSC-MT3/S. GAYLOR

——————————————————————————-