Status Report

Space Shuttle Processing Status 28 Mar 2002

By SpaceRef Editor
March 28, 2002
Filed under , ,

MISSION: STS-110 – 13th ISS Flight (8A) – ITS S0 TRUSS AND MOBILE TRANSPORTER

VEHICLE: Atlantis/OV-104

KSC LAUNCH DATE: April 4, 2002

LAUNCH PERIOD: 2 – 6 p.m. EST

TARGET KSC LANDING DATE: April 15, 2002

MISSION DURATION: 11 days

CREW: Bloomfield, Frick, Ross, Smith, Ochoa, Morin, Walheim

ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees

Shuttle Processing Note: Pre-launch preparations of Shuttle Atlantis continue to run smoothly at Pad B for the STS-110 mission to the International Space Station on April 4. The S-Zero truss segment and the Canadarm2 Mobile Transporter were installed in the orbiter payload bay yesterday. Today, technicians will install and connect space vehicle ordnance and pressurize the hypergolic fuel systems. Aft closeouts of the orbiter and Solid Rocket Boosters will continue through the weekend. On Saturday, six bolts on the left hand Orbiter Maneuvering System fuel flange will be removed and replaced. Recent test data has indicated that the bolts do not meet the correct specifications. The work will have no impact on the launch schedule.

SpaceRef staff editor.