Space Shuttle Processing Status 21 May 2001
MISSION: STS-104 – 10th ISS Flight (7A) – Airlock
VEHICLE: Atlantis/OV-104
LOCATION: Orbiter Processing Facility (OPF) bay 3
TARGET KSC LAUNCH DATE/TIME: NET June 14, 2001 at 4:11 p.m. EDT
TARGET KSC LANDING DATE/TIME: June 25, 2001 at 11:51 a.m.
MISSION DURATION: 10 days, 19 hours and 40 minutes
CREW: Lindsey, Hobaugh, Kavandi, Gernhardt, Reilly
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees
Shuttle Processing Note: Over the weekend, work on the Atlantis’ left-hand
umbilical door concluded and final door cycling tests occur today. The
orbiter’s aft and midbody compartments have been closed-out, and payload bay
door closure is complete. Preparation to transfer Atlantis to the Vehicle
Assembly Building is underway.
Tonight, workers begin weight and center of gravity tests. Atlantis will be
mounted on the orbiter transport system tomorrow and then rolled over to the
VAB Tuesday afternoon. Once in the VAB, Atlantis will be lifted into high
bay 1 and mated to the external tank and solid rocket boosters.
The Space Station Airlock, the primary payload for STS-104, will be
delivered to the pad’s payload changeout room tonight.
Upcoming Milestones (dates are targets only):
Orbiter transfer to VAB – May 22
Space Shuttle rolls out to Launch Pad 39B – May
27
Flight Readiness Review – May 31
Terminal Countdown Demonstration Te
st complete – June 1
MISSION: STS-105 – 11th ISS Flight (7A.1) – Leonardo MPLM
VEHICLE: Discovery/OV-103
LOCATION: OPF bay 2
TARGET KSC LAUNCH DATE/TIME: July 12, 2001 at 4:45 a.m. EDT
TARGET KSC LANDING DATE/TIME: July 23, 2001
MISSION DURATION: 11 days
CREW: Horowitz, Sturckow, Barry, Forrester; (ISS up) Culbertson, Dezhurov,
Turin; (ISS down) Usachev, Voss, Helms,
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees
Shuttle Processing Note: Last Saturday, the flight crew completed the
standard crew equipment interface test here at KSC. Discovery’s main engine
and main propulsion system have passed routine leak checks and main engine
heat shield installation is in work. This week, the orbiter’s water spray
boilers are undergoing checks along with servicing of Discovery’s potable
water system.
MISSION: STS-108 – 12th ISS Flight (UF1) – MPLM
VEHICLE: Endeavour/OV-105
LOCATION: Orbiter Processing Facility bay 1
TARGET KSC LAUNCH DATE/TIME: Nov. 29, 2001
TARGET KSC LANDING DATE/TIME: Dec. 9, 2001
MISSION DURATION: 10 days
CREW: Gorie, Kelly, Godwin, Tani; (ISS up) Onufrienko, Bursch, Walz; (ISS
down) Culbertson, Dezhurov, Turin
ORBITAL INSERTION ALTITUDE and INCLINATION: 122 nautical miles/51.6 degrees
Shuttle Processing Note: Post flight inspections of Endeavour’s main
propulsion system are complete. Forward reaction control system checks are
on going, and engine heat shield removal is in work. Managers plan to
remove Endeavour’s main engines this week.
MISSION: STS-109 – HST Servicing Mission 3B
VEHICLE: Columbia/OV-102
LOCATION: Vehicle Assembly Building high bay 4
TARGET KSC LAUNCH DATE/TIME: Jan. 17, 2002
TARGET KSC LANDING DATE/TIME: Jan. 28, 2002
MISSION DURATION: TBD
CREW: Altman, Carey, Grunsfeld, Currie, Newman, Linnehan, Massimino
ORBITAL INSERTION ALTITUDE and INCLINATION: 308 nautical miles/28.5 degrees
Shuttle Processing Note: Columbia is being stored in VAB high bay 4 until
Atlantis moves to the VAB to be mated to the STS-104 external tank and solid
rocket boosters. Columbia will then be transferred into OPF bay 3 to
continue STS-109 preflight processing.