Space Shuttle Processing Status 13 May 2002
MISSION: STS-111 – 14th ISS Flight (UF2) – MPLM
VEHICLE: Endeavour/OV-105
LAUNCH DATE: May 30, 2002
LAUNCH PERIOD: 4-8 p.m. EDT
KSC LANDING DATE: June 11, 2002
MISSION DURATION: 11 days
CREW: Cockrell, Lockhart, Chang-Diaz, Perrin; (ISS up) Korzun, Whitson, Treschev; (ISS down) Onufrienko, Bursch, Walz
ORBITAL INSERTION ALTITUDE AND INCLINATION: 122 nautical miles/51.6 degrees
Shuttle Processing Note: Over the weekend at Pad A, technicians completed inspections of 13 connector savers in the orbiter T-0 umbilicals after initial checks indicated several savers appeared to be loose. Only one of the 13 savers was not locking properly and was replaced. Workers today are inspecting welds on Mobile Launcher Platform 1 to verify the structural integrity of the hydrogen vent line. The Multi-Purpose Logistic Module interface verification test is complete. Payload bay doors are closed and payload closeouts are scheduled to begin today. Preparations for hypergolic loading are in work. The Terminal Countdown Demonstration Test for mission STS-111 is scheduled this week.
MISSION STS-107 -SPACEHAB/ FREESTAR MICROGRAVITY RESEARCH MISSION
VEHICLE – Columbia/OV-102
LAUNCH DATE: July 19, 2002
KSC LANDING DATE: August 4, 2002
MISSION DURATION: 16 days
CREW: Husband, McCool, Anderson, Chawla, Brown, Clark, Ramon
ORBITAL INSERTION ALTITUDE AND INCLINATION: 150 nautical miles/39 degrees
Shuttle Processing Note: Processing for Columbia’s STS-107 microgravity research mission continues in the Orbiter Processing Facility (OPF). Right-hand Orbital Maneuvering System pod thruster replacements are complete. Payload premate test, Auxiliary Power Unit leak and functional test, and servicing of Freon Loop No. 1 are in work.
MISSION STS-112 — 15TH ISS FLIGHT (9A) – BA, ITS S1
VEHICLE: Atlantis/OV-104
LAUNCH DATE: August 22, 2002
KSC LANDING DATE: September 1, 2002
MISSION DURATION: 10 days
CREW: Ashby, Melroy, Wolf, Sellers, Magnus, Yurchikhin
ORBITAL ALTITUDE AND INCLINATION: 122 nautical miles, 51.6 degrees
Shuttle Processing Note: In the OPF, processing continues for the schedule launch of Atlantis to the International Space Station this August. Master Events Controller/Pyro Initiator test is complete. Orbital Maneuvering System checkout is in work.
ORBITER MAJOR MODIFICATION PERIOD
VEHICLE: Discovery/OV-103
Shuttle Processing Note: Discovery is in the OPF awaiting the start of its Orbiter Major Modification (OMM) period that is scheduled to begin at the Kennedy Space Center late this summer.