Status Report

SOHO Daily Report 27 December 2001

By SpaceRef Editor
December 27, 2001
Filed under , ,

Operations Day – 361/2001 (27 December 01)
Mission Day 2218

SOHO FLIGHT OPERATIONS TEAM, NASA/GSFC
Ref. #: SH-FOT-DR-011226
=====================================================================
PASS #1 Madrid DSS66 0637-1111
PASS #2 Goldstone DSS27 1558-1830
PASS #3 Canberra DSS46 1820-362/0650
*********************************************************************

PASS #1 Madrid DSS66 0637-1111

Anomalies:

None

NRT:

None

Activities Summary:

– SSR Dump
– Collected MDI-M (0817-0832)
– Collected MDI-H (0832-1050)
– Min/Max Data Collection (PROS)
– OBT Distribution to SWAN, CELIAS
– SSR SEF Reset
– SSR Record
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
——————

PASS #2 Goldstone DSS27 1558-1830

Anomalies:

None

NRT:

None

Activities Summary:

– SSR Dump
– Collected MDI-M (1803-1819)
– Collected MDI-H (1819-1830)
– New Tracking Star Slot 1/ Magnitude 2.95
– Uplinked delayed load VIRA11228, SWA011227121
– Reaction Wheel Speed Monitoring Daily Adjustment
– CRS Drift Estimation Update
– HGA Table Upload
– Hx Limit Update
– SSR SEF Reset
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
——————

PASS #3 Canberra DSS46 1820-362/0650

Anomalies:

G01-0518 2008 Lost uplink lock on spacecraft RCVR 2, cause unknown.
Lost command
ability for 4 minutes. DR #C100760.

NRT:

1918-2008
2021-2056

Activities Summary:

– Collected MDI-M (1829-2014, 0230-0332)
– Collected MDI-H (1820-1829, 2014-0230, 0332-0631)
– Min/Max Data Collection (PROS)
– OBT Distribution to SWAN, CELIAS
– Cleared COBS anomaly counter and table
– SSR SEF Reset
– SSR Record
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 24
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
– Executed CS-20B: Bat1 BCR Status Change – Std Mon 25
——————

— End of Report —

SpaceRef staff editor.