Status Report

SOHO Daily Meeting Minutes for Thursday, 14 March 2002

By SpaceRef Editor
March 14, 2002
Filed under , ,

ANNOUNCEMENTS
————-
* HESSI target for today: AR 9866

* PEPCO will perform Preventive Maintenance on a GSFC feeder
from March 16 at 5:00 am until March 17 at 6:00 pm. There
should be no impact, however as with any outage there is the
possibility of power glitches.

* There will be a power outage for maintenance work in building
21 on Saturday March 16.

FOT REPORT
———-
Spacecraft Status: Nominal

Spacecraft Anomalies:
072/2306 BDR 2 on battery 1 switched off unexpectedly.
No impacts.

Accomplished Activities: VIRGO, SWAN, New Tracking Star (6.5)

Planned Activities: VIRGO, NOM HGA

Upcoming Operations: None

Ground Anomalies:
072/1505 Wayward command. 11 commands retransmitted. 12 min
commanding delay.

SOLAR STATUS
————
03/13 DOY 072 – 03/14 DOY 073

EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020314.html

LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.html

Web Page for Planning:
http://www.bbso.njit.edu/arm

INSTRUMENT STATUS
—————–
CDS: Nominal. Today – JOP118 and particle beam study on AR 9866.
Friday – JOP118 on AR 9866 and active region mapping study.

UVCS: Nominal. Coronal hole observations in the north and mini synoptic
today, coronal hole observations and long synoptic Friday.

LASCO: Nominal. C2/C3 synoptics.

EIT: Nominal. 195 Angstrom CME watch and synoptics.

MDI: Nominal. Full disk magnetograms and dopplergrams.
After 16 UT MDI will do 4 hours of high res
observations as AR 9866 is passing through the
high res field of view.

TRACE: Nominal. Tracking AR 9866 in 171A and supporting JOP118.

SpaceRef staff editor.