SOHO Daily Meeting Minutes for Monday, 25 March 2002
ANNOUNCEMENTS
————-
* HESSI target for today is AR 9876, tomorrow’s target is AR 9878* PMI contractors are scheduled to perform preventive maintenance
on the 3UPS-20 on March 29 from 9:00 am until 4:30 pm. The UPS
unit will be in bypass and the load will be on commercial power
during this activity. No impact to operations is expected. 3UPS-20
supports SOHO, W/P, and XTE missions.FOT REPORT
———-
Spacecraft Status: Nominal, SUMER offSpacecraft Anomalies:
080/1025 CEPAC ESU Data Request Error recovered autonomously
after 3 minutes.Accomplished Activities:
DOY 081: VIRGO, CELIAS, RSL
DOY 082: VIRGO, CELIAS
DOY 083: VIRGO, CELIAS, Noncoho Load, Flight S/W Maint.Planned Activities: VIRGO
Upcoming Operations: None
Ground Anomalies:
082/0326 AOS at D46 late 1 minute 47 seconds due to a LMP
failure. DR #C101036.
082/0432 TGC failure at D46 resulted in 2 minutes 14 seconds
of lost, unrecoverable TLM. DR #C101037.
083/1426 Wayward command delayed commanding activities
2 minutes 56 seconds.SOLAR STATUS
————
03/22 DOY 081 – 03/25 DOY 084EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20020325.htmlLASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/2001/Todays_obs.htmlWeb Page for Planning:
http://www.bbso.njit.edu/armINSTRUMENT STATUS
—————–
CDS: Nominal. JOP118 on AR 9878. Tomorrow: JOP136, polarity reversal
study in the south.UVCS: Nominal. Coronal hole streamer study and mini-synoptic.
Tomorrow: 24-hour synoptic.LASCO: Nominal. C2/C3 synoptics.
EIT: Nominal. 195 Angstrom CME watch and synoptics.
MDI: Nominal. Full disk magnetograms and dopplergrams for continuous
contact. Continuous contact started on Saturday.TRACE: Nominal. JOP118 in 171A.