SOHO Daily Meeting Minutes for Friday 20 June 2003
ANNOUNCEMENTS
* See note at end for latest HGA information.
* There was no weekly meeting today. See note at end for details
on next week.
* A Major Flare Watch has been declared on AR10386. The campaign
number is 6961.
* EIT Shutterless is today. No NRT will be available from 17-19:40 UT.
* GITT scans for the EOF and EAF are scheduled for Thursday 26 June
at 9:30am.
FOT REPORT
Spacecraft Anomalies: None
Accomplished Activities: HGA test activities
Planned Activities: VIRGO, SWAN, MDI, RSL,
New tracking star, mag = 7.5
Upcoming Operations: None
Ground Anomalies: None
SOLAR STATUS
06/19 DOY 170 – 06/20 DOY 171
EIT daily On-Line Solar Status and observations:
http://umbra.nascom.nasa.gov/eit/plan/log_form20030620.html
LASCO daily On-Line Solar Status and observations:
http://lasco-www.nrl.navy.mil/observations/Todays_obs.html
Web Page for Planning: http://www.bbso.njit.edu/arm
Magnetic Maps and Heliospheric Forecasts: http://www.lmsal.com/forecast/
INSTRUMENT STATUS
CDS: Nominal. JOP153, EIT shutterless support, La Palma study,
coronal hole spectral atlas. Weekend: Explosive events study,
off-limb spectral study in the north and south, GIS spectral
atlas, CME onset study, engineering, GIS QS monitoring.
UVCS: Nominal. Streamer study and synoptics.
LASCO: Nominal. C2/C3 synoptics, JOP153, JOP159.
EIT: Nominal. 195 CME watch and synoptics, JOP153, JOP159,
and shutterless campaign.
MDI: Nominal. Full disk magnetograms and dopplergrams, JOP153,
EIT shutterless and La Palma support.
TRACE: Nominal. La Palma support, JOP153.
AOB
Yesterday morning we tried several options to move the HGA, without
success. We then decided to use both the A and B motor windings
simultaneously, in an effort to increase the motor torque. This was
successful and we managed to move the antenna by +4.2 deg to the “sweet
spot” at -17.9 deg. 4 encoder pulses were received at exactly the right
time. An attempt of operating the motor with only the A side winding
after the first two pulses in the double-motor mode was
unsuccessful again. In this position, we would lose about 19 days of
high rate telemetry every three months, starting late next week. This
would give us approximately 80% coverage.
Starting mid-week next week we expect to lose the HGA signal for ~20
days. Instruments need to prepare for this outage on Monday and Tuesday.