SERVIS – 1 Daily Report L-44

L-44 , 15 September 2003

With unpacking of the spacecraft ground support equipment in the integration
facility MIK the launch has started according to schedule. The fair weather
of yesterday turned today to rainy one with day temperatures about 15 degree
C. The launch crew did not care much about it when enjoying Japanese food at
the dinner prepared by Ms. Anegawa and Ms. Kim.

SERVIS-1 Journal S-2

Plesetsk, 14 September 2003

The SERVIS 1 Spacecraft has arrived the Integration Facility (MIK) yesterday
September 13th. Protected by KSRC Security (Picture 1) it is now waiting for
handling by its team that arrived today with two YAK 40 aircraft in Plesetsk
(Picture 2). In a party hosted by USEF Mr. Oka, Deputy Project Manager
opened one eye of Daruma (Picture 3) who according to a Japanese tradition
will make his wish true. Then the second eye will also be opened. Because of
old Russian tradition Mr. Oka was reluctant to reveal his wish. He said
during the campaign Daruma will watch upon his shoulder in his office in the
MIK.

Photo Report:

http://www.eurockot.com/asp/show2.asp?cat_id=32&main_cat_id=32&cnt_id=83

SERVIS-1 Journal S-1

Plesestk, 12 September 2002

The special train carrying SERVIS1 Spacecraft has arrived Plesetsk Station
with only 10 minutes delay. Preparation of forwarding to the integration
facility is in progress and expected to be completed today.

Images show loading in Tokyo to the Palet Flight AN 124 and crossloading in
Archangel and the escorting team.

Photo Report:

http://www.eurockot.com/asp/show2.asp?cat_id=32&main_cat_id=32&cnt_id=82