SATOPS Morning Report – March 14, 2003 Day 073
DMSP
DMSP operations were nominal over the past 24 hours.
POES
NOAA-15 rev 25111 / F at 1908Z on March 13: Executed SCR #62, to run CP TX1SS. This command procedure was used to make changes to the STESM parameters for N-15. Commanding was uneventful and all systems appear nominal.
POES operations were nominal over the past 24 hours.
GOES
At 0524Z on March 14, a GOES-10 frame break was observed and attributed to high BER at CDA (unknown cause).
Eclipse operations for all spacecraft continue. Eclipse schedules for GOES-8 and GOES-10 (which can be used to track the day-to-day image deletions due to KOZ and eclipse) can be found at:
http://www.oso.noaa.gov/goes/koz-eclipse/koz-eclipse.htm
GOES-12 remains in a test phase, in normal on-orbit mode, drifting at an eastward rate of ~0.33 degrees per day toward the GOES-East position where it will replace GOES-8 in April. Routine SXI imaging is proceeding along with SXI test exposures. Between 2002Z and 2132Z, magnetometer testing was performed as per SCP.
GOES-9 is currently at approximately 174.3 W drifting at a westward rate of ~0.735 degrees per day toward 155 E longitude where it will support the GMS-5 replacement mission in April. Canberra and Goldstone DSN ranging activities are continuing.
GOES operations were nominal over the past 24 hours.