NOAA SATOPS Morning Report: Wednesday, November 16, 2005
Day 320
DMSP
All DMSP operations were nominal over the past 24 hours
For DMSP Information please see: http://dmsp.ngdc.noaa.gov/dmsp.html
POES
All POES operations were nominal over the past 24 hours.
For a detailed status and description of POES see: http://www.oso.noaa.gov/poes/index.htm
GOES
The scheduled GOES-9 maneuver was successful. The satellite is drifting east at approximately 0.14 degrees per day. The stop maneuver will occur on or about December 13, 2005.
The Wallops Backup site has disconnected from the network. A trouble ticket has been submitted and the circuit vendor is looking into the problem.
All other GOES operations were nominal over the past 24 hours.
For GOES Status and other information please see: http://www.oso.noaa.gov/goes/index.htm