NOAA SATOPS Morning Report: Tuesday, October 04, 2005

DAY 277
DMSP
All DMSP operations were nominal over the past 24 hours.
For DMSP Information please see: http://dmsp.ngdc.noaa.gov/dmsp.html
POES
NOAA-18 Rev 01922 at Wallops at 1844Z on Oct 3: 13M ‘B’ ANT would not track at scheduled AOS. HRPT TLM was not available until the last 3 minutes of the pass; an unsuccessful attempt was made to replay L1A, because it was going into record during the next pass. However, command capability was lost after positioning the DTR and it could not be replayed during this pass. L1A will be unrecoverable and will be placed into record manually during the next pass. G1A was commanded into record at FRT (~2121Z), making G1A short (88.35% recovered).
All POES operations were nominal over the past 24 hours.
For a detailed status and description of POES see: http://www.oso.noaa.gov/poes/index.htm
GOES
All GOES operations were nominal over the past 24 hours.
ECLIPSE: To review GOES Fall eclipse and KOZ schedules, please reference: http://www.ssd.noaa.gov/PS/SATS/eclipse.html
Additional information can be found at: http://www.ssd.noaa.gov/PS/SATS/messages.html
For GOES Status and other information please see: http://www.oso.noaa.gov/goes/index.htm
Questions or comments to Keith.Amburgey@noaa.gov