NOAA SATOPS Morning Report: Tuesday, May 31, 2005
DAY 151
DMSP
*OPS 54 Rev 08329 R+03 at FBKS at 06:31z on May 30: Cat2 Data loss, due to FBKS IMUX failure (962 S/C seconds and 481 P/B seconds)
All DMSP operations were nominal over the past 72 hours.
POES
NOAA-18 Update:
The following instruments have been turned on;
- AVHRR VIS CH (1,2,3A) 5/20/05 140/1515z
- SARR Turn on 5/23/05 143/1620z
- SARP Turn on 5/23/05 143/1745z
- AMSU-A1 Turn on 5/24/05 144/1735z
- AMSU-A2 Turn on 5/24/05 144/1915z
- MHS Turn on 5/25/05 145/1730z
- SBUV Turn on 5/27/05 147/1635z
- DCS Turn on 5/27/05 147/1715z
The schedule for the remaining instruments to be turned on is;
- AVHRR(IR) scheduled 6/5/05 about 1400z
- HIRS scheduled 6/5/05 about 1545z
- SEM scheduled 6/6/05 about 1530z
All POES operations were nominal over the past 72 hours.
GOES
All other GOES operations were nominal over the past 72 hours.
Questions or comments to Keith.Amburgey@noaa.gov