NOAA SATOPS Morning Report: Tuesday, May 31, 2005

By SpaceRef Editor
May 31, 2005
Filed under ,

DAY 151

DMSP

*OPS 54 Rev 08329 R+03 at FBKS at 06:31z on May 30: Cat2 Data loss, due to FBKS IMUX failure (962 S/C seconds and 481 P/B seconds)

All DMSP operations were nominal over the past 72 hours.

POES

NOAA-18 Update:

The following instruments have been turned on;

  • AVHRR VIS CH (1,2,3A) 5/20/05 140/1515z
  • SARR Turn on 5/23/05 143/1620z
  • SARP Turn on 5/23/05 143/1745z
  • AMSU-A1 Turn on 5/24/05 144/1735z
  • AMSU-A2 Turn on 5/24/05 144/1915z
  • MHS Turn on 5/25/05 145/1730z
  • SBUV Turn on 5/27/05 147/1635z
  • DCS Turn on 5/27/05 147/1715z

The schedule for the remaining instruments to be turned on is;

  • AVHRR(IR) scheduled 6/5/05 about 1400z
  • HIRS scheduled 6/5/05 about 1545z
  • SEM scheduled 6/6/05 about 1530z

All POES operations were nominal over the past 72 hours.

GOES

All other GOES operations were nominal over the past 72 hours.