NOAA SATOPS Morning Report: Monday, May 23, 2005
Day 143
DMSP
All DMSP operations were nominal over the past 72 hours.
POES
NOAA-15 Rev 36495 at Wallops at 1119Z on 21 May G3B short: 2.6% recovered. G3B not recoverable due to DTR mgmt. G4B noisy due to antenna masking.
NOAA-15 Rev 36501 at Wallops at 2100Z on 21 May: G4B short of expected frames: 95% recovered. Tape at BOT.
NOAA-16 Rev 24043 at Fairbanks at 1045Z on May 22: L1A locked-up on B/S but not F/S. There was only 4 minutes from the beginning of this PB until LRT, so a replay from the S/C during this pass was not possible. DTR1A goes into record prior to the next pass, so L1A is unrecoverable.
All POES operations were nominal over the past 72 hours.
GOES
All other GOES operations were nominal over the past 72 hours.
Questions or comments to Keith.Amburgey@noaa.gov