DOY 110

GOES
All GOES operations were nominal over the past 72 hours.
No anomalies affecting product delivery or s/c health & safety.
For GOES status and other information please see:
http://www.oso.noaa.gov/goes

POES
N15 DOY107 1930Z partial delivery of GAC2A (11528/12610 frames) due to a problem at FCDA

N18 DOY108 2022z MHS spin state mode, crews send COP but instrument went into fault mode. Engineers investigating

All other POES operations were nominal over the past 72 hours.
No anomalies affecting product delivery or s/c health & safety.
For a detailed status and description of POES see:
http://www.oso.noaa.gov/poes

DMSP
OPS49 DOY108 2214Z BOSS-B Data played down noisy and unusable. Data
Loss: Smooth 10252 s/c seconds, TL 348.7 playback seconds

OPS 54 DOY 108 2247 BOSS-B Data very noisy and unusable. LF 125 playback seconds, 500 spacecraft seconds.

All other DMSP operations were nominal over the past 72 hours.
No anomalies affecting product delivery or s/c health & safety.
For more DMSP Information please see:
http://dmsp.ngdc.noaa.gov/dmsp.html

JASON-2
All JASON-2 operations were nominal over the past 72 hours.
No anomalies affecting product delivery or s/c health & safety.