NOAA SATOPS Morning Report: Friday, September 09, 2005

DAY 252
DMSP
All DMSP operations were nominal over the past 24 hours.
For DMSP Information please see: http://dmsp.ngdc.noaa.gov/dmsp.html
POES
All POES operations were nominal over the past 24 hours.
For a detailed status and description of POES see: http://www.oso.noaa.gov/poes/index.htm
GOES
GOES 9 at 1926Z on Sept 8: Schedule suspended, could not verify VCC of the 1925 South Sounding Register load. At 1928Z, the scheduled was killed due to an apparent sounder proportional command failure. Recovered using procedure but lost South Sounding. At 1951z the schedule was back on line. Engineers investigating.
All GOES operations were nominal over the past 24 hours.
ECLIPSE: To review GOES Fall eclipse and KOZ schedules, please reference: http://www.ssd.noaa.gov/PS/SATS/eclipse.html
Additional information can be found at: http://www.ssd.noaa.gov/PS/SATS/messages.html
For GOES Status and other information please see: http://www.oso.noaa.gov/goes/index.htm