NOAA GOES SATOPS Morning Report: Friday, February 11, 2005
DAY 42
DMSP
All DMSP operations were nominal over the past 24 hours.
POES
N14 rev 52163 at Fairbanks 175520z. Executed CP BATVMIN as per RCP # 14_237_1 to lower minimum battery voltages to 18.98 and change Sun Return Battery V/T curves to 7/8/7.
All other POES operations were nominal over the past 24 hours.
GOES
All GOES operations were nominal over the past 24 hours.