Status Report

NOAA GOES SATOPS Morning Report – August 18, 2003  Day 230 

By SpaceRef Editor
August 18, 2003
Filed under , ,

DMSP 

All DMSP operations were nominal over the past 3 days. 

POES 

All POES operations were nominal over the past 3 days. 

GOES 

GOES battery #1 reconditioning activities were successfully completed for all five spacecraft last week; battery
#2 reconditioning is in process as part of normal pre-eclipse season preparations.  For GOES Fall eclipse and
KOZ schedule, please reference this web site: http://www.ssd.noaa.gov/PS/SATS/eclipse.html

Between 2215Z on August 16 and 0135Z on August 17, numerous GOES-10 frame breaks were observed and attributed to high BER caused by thunderstorms at WCDAS. 

Between 2252Z on August 16 and 0122Z on August 17, numerous GOES-12 frame breaks were observed and attributed to high BER caused by thunderstorms at WCDAS. 

At 0224Z and between 0618Z and 0658Z on August 17, numerous GOES-10 frame breaks were observed and attributed to high BER caused by thunderstorms at WCDAS. 

Between 0641Z and 0657Z on August 17, numerous GOES-12 frame breaks were observed and attributed to
high BER caused by thunderstorms at WCDAS. 

At 1103Z and 1115Z on August 17, GOES-12 frame breaks were observed and attributed to high BER caused by thunderstorms at WCDAS. 

At 2009Z on August 17 and 0036Z on August 18, GOES-10 frame breaks were observed and attributed to high BER (unknown).

At 0950Z on August 18, a GOES-10 frame break was observed and attributed to loss of signal synchronization.

GOES-8 continues its westward drift at 1.06 deg/day.  The drift table with the estimated current position can be found at  http://www.oso.noaa.gov/goes/GOES-8_Drift_Table.txt.  GOES-8 will be stopped at 165E on August 24 at 0930Z. 

SpaceRef staff editor.