Status Report

NOAA GOES SATOPS Morning Report – April 4, 2003 Day 094 

By SpaceRef Editor
April 4, 2003
Filed under , ,

DMSP 

All DMSP operations were nominal over the past 24 hours. 

POES 

All POES operations were nominal over the past 24 hours. 

GOES 

At 1512Z on April 3, the GOES-9 X-Ray positioner and the solar array were repositioned to allow the SAS to get a better sun reference reading.  All commanding was nominal. 

At 1748Z on April 3, a new SXI imaging sequence (optimized for eclipse season) was uploaded as per SCP and as coordinated with SEC.  Two segments of ICT62 were loaded. 

GOES-12 will continue to drift at an eastward rate of ~0.33 degrees per day toward 75 degrees W until the stop maneuver is performed on approximately April 22.  Until GOES-12 arrives on-station, the GOES-12 will be retransmitted via GOES-8 (to minimize impacts to the users). 

GOES-9 is currently at approximately 170.5 E drifting at a westward rate of ~0.717 degrees per day toward 155 E longitude where it will support the GMS-5 replacement mission in April. 

Eclipse operations for all spacecraft continue.  Eclipse schedules for GOES-East and GOES-West (which can be used to track the day-to-day image deletions due to KOZ and eclipse) can be found at: 
http://www.oso.noaa.gov/goes/koz-eclipse/koz-eclipse.htm 

Major upcoming GOES milestones (Note: These dates are subject to change) 

  • April 15:  GOES-9 removal from storage 
  • April 16-19:  GOES-9 GVAR begins, INR startup with a 0.7 deg/day drift 
  • April 22:  GOES-12 stops at 75 deg W; ancillary communication services (DCS, WEFAX, EMWIN, SAR) become operational. 
  • April 24:  GOES-8 drift start westward from 75 W 
  • April 25:  GOES-9 drift stop at 155 E 

All GOES operations were nominal over the past 24 hours.

SpaceRef staff editor.