NOAA GOES SATOPS Morning Report April 1, 2003 Day 091

By SpaceRef Editor
April 1, 2003
Filed under , ,

DMSP

All  DMSP operations were nominal over the past 24 hours.

POES

All  POES operations were nominal over the past 24 hours.

GOES

GOES-12 continues to drift at an eastward rate of ~0.33 degrees per day toward the GOES-East position where it will replace GOES-8 today, April 1, between 1800 and 1815z.   The GOES-12 stop maneuver is scheduled for approximately April 22.  Thanks to GOES-8 for almost 9 years of great support!!

GOES-9 is currently at approximately 172.6 E drifting at a westward rate of ~0.720 degrees per day toward 155 E longitude where it will support the GMS-5 replacement mission in April.

Eclipse operations for all spacecraft continue. Eclipse schedules for GOES-East and GOES-West (which can be used to track the day-to-day image deletions due to KOZ and eclipse) can be found at:  http://www.oso.noaa.gov/goes/koz-eclipse/koz-eclipse.htm

Major upcoming GOES milestones (Note:  These dates are subject to change)

  • April 1:  GOES-12 becomes operational GOES-East for imaging/sounding at 1815z
  • April 15:  GOES-9 removal from storage
  • April 16-19:  GOES-9 GVAR begins, INR startup with a 0.7 deg/day drift
  • April 22:  GOES-12 stops at 75 deg W; ancillary communication services (DCS, WEFAX, EMWIN, SAR) become operational.
  • April 24:  GOES-8 drift start westward from 75 W
  • April 25:  GOES-9 drift stop at 155 E