NASA STS-123 Execute Package FD05
Great job on EVA1! One down, four to go.
1) Please Pen and Ink the following to the FDF EVA Checklist, EMU SWAP FOR EVA 2, page FS 2-13:
Prior to Step 1 add: Verify helmet s/n 1073 is on EMU 3004 and helmet s/n 1069 is on EMU 3006.
2) We are planning a nominal EVA 2 timeline with the only exception is that we will be leaving the OTCM 2 sock installed for thermal reasons.
3) For our planning purposes for later in the mission, can you tell us which crewlock bag(s) may already have tape installed on the doors for the SARJ tasks?
4) Peggy, We were wondering if you were able to perform the EVA ratchet wrench inspection per message 16-1315? Planning to put the ratchet back out during EVA 3. Just let us know, thanks.
5) Rick, Based on your comments on the overgloves having tight thumbs during EVA 1, do you think using the old-style overgloves would be an improvement to your fit and comfort or rather a hindrance with the tasks you will be performing? The old- style overgloves are one-size-fits-all and have the larger thumbs. There are old- style overgloves that are on board that you can use.
6) Rick, Again, based on your glove fit comments during the EVA, would you like the ground glove team to provide you with suggestions for moleskin or molsite placements to help with your hot spots?
7) Rick & Garrett, Do you believe there is anything that can be done to the SCU routing in the crewlock that would prevent SCU entanglement on future EVAs? Would a different routing help with SCU install on the DCM for EV1?