NASA Space Station On-Orbit Status 20 October 2005

By SpaceRef Editor
October 20, 2005
Filed under , , ,
NASA Space Station On-Orbit Status 20 October 2005
http://images.spaceref.com/news/exp.12.jpg

SpaceRef note: This NASA Headquarters internal status report, as presented here, contains additional, original material produced by SpaceRef.com (copyright © 2005) to enhance access to related status reports and NASA activities.

All ISS systems continue to function nominally, except those noted previously or below.  

FE Valery Tokarev assembled gear required for processing condensate water for the Elektron oxygen generator, using the electric condensate pumping unit (BPK) of the Russian water processing system (SRV-K2) behind Service Module (SM) panels 433, 435, and 436 and U.S.-collected water in CWC (collapsible water container) #1027.

The crew completed the third and final day for the current renal (kidney) stone experiment session (the first of three for Expedition 12), by collecting one final urine sample in the morning and finishing their dietary/metabolic log entries.  The FE then stowed all equipment.   [This long-range preventive medicine investigation features daily ingestion of either potassium citrate or placebo tablets.  It is a double-blind research study by NASA/JSC, investigating statistically whether potassium citrate is as effective in zero-G in preventing formation of kidney stones as it is on the ground.  The experiment requires keeping a metabolic diet log (food & fluid intake), followed by collection of urine samples several times per day during the three-day session, with collections ending today.]

After setting up the video hardware for recording the activity, McArthur and Tokarev performed their first general MedOps PFE (periodic fitness evaluation), a 1.5-hr. procedure that checks up on blood pressure and electrocardiogram (ECG) during programmed exercise on the CEVIS (cycle ergometer with vibration isolation) in the Lab.  Readings were taken with the BP/ECG (blood pressure/ECG) and the HRM (heart rate monitor) watch, with each crewmember assisting his crewmate in turn to initiate the BP measurements.  The video equipment was then stowed again.   [BP/ECG provides automated noninvasive systolic and diastolic blood pressure measurements while also monitoring and displaying accurate heart rates on a continual basis at rest and during exercise.  Besides the regular fitness monitoring function, PFE also checks out the subject for EVA.  The video showing the pedaling on the ergometer bike is required for biomechanical evaluation of subject and equipment setup during data collection.]

Afterwards, Bill McArthur broke out and set up the equipment for tomorrow’s planned Russian “Urolux” biochemical urine test (PZE MO-9) and U.S. PHS (periodic health status) assessment.

The CDR completed the monthly PEP (portable emergency provisions) safety inspection.  [The inspection involves verification that PFEs (portable fire extinguishers), PBAs (portable breathing apparatus), QDMAs (quick-don mask assemblies) and EHTKs (extension hose/tee kits) are free of damage to ensure their functionality, and to track shelf life/life cycles on the hardware.  There are a total of 5 PBAs in the U.S.segment (USOS).  There is only one EHTK, in the Lab.]

The FE collected the periodic reading of the cabin air’s current CO2 concentrations in the SM and Lab, using the U.S. CDMK (Carbon Dioxide Monitoring Kit, #1015), for calldown, along with its battery status, taken after pump start-up, for use in trending analyses.

Valery also collected the weekly air data with the new Real-Time Harmful Contaminant Gas Analyzer (GANK-4M) system of the SM’s pressure control & atmospheric monitoring system (SOGS).

Bill prepared the regular daily IMS (Inventory Management System) “delta”/update file for automated export/import to the three IMS databases (MCC-H, TsUP, Baikonur).

 

Shuttle
Processing Status
News
Daily Mission
Return to Flight
ISS
Weekly Status
Weekly Science
Daily On-Orbit Status
Daily Crew Timeline
Soyuz | Progress
ISS News | ATV

Both crewmembers had another 90 minutes today for reviewing the timeline of the next U.S. spacewalk, EVA-4, scheduled for 11/7.  Afterwards (~1:55pm EDT), they tagged up with ground specialists at MCC-Houston to discuss specifics.  There will be two more EVA timeline reviews, on 11/1 and 11/4.   [The spacewalk, from the “Quest” Airlock (A/L) in EMU (Extravehicular Mobility Unit) suits, is estimated to last 5h 25m.  Primary objectives: installation of an external video camera assembly (CP9 ETVCG, External TV Camera Group) on a stanchion on the P1 segment (lower outboard), and the removal and subsequent jettisoning/throwing of the FPP (Floating Potential Probe) with its solar arrays and extended probes from the top of the Z1 truss (portside), it in retrograde direction (about 30 deg zenith and 10 deg port of the ISS minus X-axis) with a velocity of at least 0.15 m/s, while the station is in XVV TEA attitude.  There are also three get-ahead tasks, if time permits: retrieval of the S1-1 RJMC (Rotary Joint Motor Controller), removal & replacement of an RPCM (Remote Power Controller Module on the MT (Mobile Transporter), and installation of a clamp from the MISSE 4 (Materials on the ISS Experiment #4) on the A/L starboard endcone zenith/aft handrail.]

The crew again had one hour each set aside on today’s schedule for ISS familiarization and adaptation, to help in adjusting to their new surroundings and activities.   [This “free” session has become a valuable standard requirement for new station occupants for the first two weeks.]

Bill and Valery completed their regular 2.5-hr. physical exercise program on the CEVIS cycle ergometer, TVIS treadmill, RED resistive machine and VELO bike with bungee cord load trainer.   [Valery’s daily protocol prescribes a strict four-day microcycle exercise with 1.5 hr on the treadmill and one hour on VELO plus load trainer (today: Day 2 of the first set).]

Later, McArthur transferred the TVIS treadmill and RED exercise data files to the MEC (Medical Equipment Computer) for downlink, as well as the daily wristband HRM data of his RED workout, followed by their erasure on the HRM storage medium (done six times a week).

At ~9:15am EDT, the crew engaged in a TV (downlink only) PAO/educational teleconference with a group of German exchange students touring TsUP with MAI (Moscow Aviation Institute) professors, organized and led by Ralf Heckel and Yvonne Blaese from the City of Leipzig (in the former East Germany).

Russian investigation of the aborted ISS reboost of 10/18 continues.  According to Moscow, it appears that four (out of eight) attitude control system thrusters of the Progress 19 failed, causing shutdown of the remaining jets by the SM GNC (guidance, navigation & control) system.  There is no issue with ISS attitude control at present.

Yesterday’s R&R (removal & replacement) of the thermal replaceable pump panel (PAS) in the Docking Compartment, part of DC-1’s thermal control system (SOTR), was successfully completed by Valery Tokarev.   [As a minor anomaly, the ground had to activate the DC-1 main program in the laptop via S-band in order for the FE to be able to turn off the old PAS.  In addition, there were some clearance issues with the tools used at the worksite.]

The software reload of the IBM 760XD currently used as MEC by the Science Officer yesterday was successful.

The Elektron remains off line.  Troubleshooting will continue tomorrow and Saturday, in two stages: testing of the system under various power modes, and attempting to push a possible air bubble in the backup micropump through, using an external flush tank.

Prior to the aborted reboost on 10/18, ISS state vectors had been sent to the TDRSS (Tracking and Data Relay Satellite System) assuming a successful reboost.  Without the full reboost, these vectors were incorrect.  Houston ground teams worked with Goddard and White Sands to uplink new TDRSS vectors.  After the issue was resolved, S-band was swapped to string 1 to support P6 2B1 battery reconditioning per the timeline.  

Reconditioning of nickel-hydrogen (NiH) battery of the P6 solar array continued today nominally.   [NiH batteries can develop and display “loss of memory” (of their state of charge), resulting in a temporary decline in capacity.  This loss can be periodically erased by cycling all cells by fully discharging and recharging them (reconditioning).  Ground teams are executing and continuously monitoring this activity, and no actions are required of the crew.  This activity is scheduled to continue through next Tuesday, 10/25.]

Viewing opportunities for Hurricane Wilma were uplinked to the ISS crew, for using the Lab ETVCG (external TV camera group).

Today’s CEO (crew earth observations) photo targets, limited in the current XPOP attitude by flight rule constraints on the use of the Lab nadir/science window, which is available for only ~1/4 of each orbit when not facing forward (in ram), were Puerto Rico, Caribbean Sea (weather has cleared over Puerto Rico, providing an opportunity for context photography of the island.  These images are useful for location of higher resolution nadir images of other targets such as reefs and long-term ecological monitoring sites), Amazon River Delta, South America (Dynamic Event. Weather and lighting conditions were predicted to be ideal for photography of the Amazon River delta.  Looking to the left of track for the delta itself; water and landforms should be visible in sharp contrast due to sunglint.  These images are useful for mapping small waterways and changes to delta and island morphology), and Hurricane Wilma, Caribbean Sea (lighting conditions were becoming less favorable, but the crew should still have had an opportunity to capture this rapidly strengthening storm.  Looking to the left of track near the Straits of Yucatan for cloud banding and the storm eye).

To date, over 177,000 of CEO images have been taken in the first five years of the ISS.

CEO photography can be viewed and studied at the websites:

See also the website “Space Station Challenge” at:

To view the latest photos taken by the expedition 12 crew visit:

Expedition 12 Flight Crew Plans can be found at http://spaceflight.nasa.gov/station/timelines/

Previous NASA ISS On-orbit Status Reports can be found here. Previous NASA Space Station Status Reports can be found here. Previous NASA Space Shuttle Processing Status Reports can be found here. A collection of all of these reports and other materials relating to Return to Flight for the Space Shuttle fleet can be found here.

ISS Location NOW

Full Size/Update
Real Time ISS TrackerMore Links

ISS Orbit  (as of this morning, 8:13am EDT [= epoch]):

  • Mean altitude — 347.0 km
  • Apogee height — 347.8 km
  • Perigee height — 346.3 km
  • Period — 91.48 min.
  • Inclination (to Equator) — 51.64 deg
  • Eccentricity — 0.0001144
  • Solar Beta Angle — 25.0 deg (magnitude increasing)
  • Orbits per 24-hr. day — 15.74
  • Mean altitude loss in last 24 hours — 85 m
  • Revolutions since FGB/Zarya launch (Nov. 98) — 39540

Upcoming Events (all times EDT):

  • TBD — ISS Reboost (two burns, to set up phasing for Progress 20P launch & circularize;)
  • 10/27/05 – EVA-04 Dry Run
  • 11/07/05 — EVA-4 (U.S.)
  • 11/18/05 — Soyuz TMA-7/11S relocation (from DC-1 to FGB nadir port)
  • 12/20/05 – Progress M-54/19P undocking & reentry
  • 12/21/05 – Progress M-55/20P launch
  • 12/23/05 — Progress M-55/20P docking
  • 01/09/06 — 100 days for Expedition 12.

 

ISS Altitude History

Apogee height Mean AltitudePerigee height

ISS Altitude History

For more on ISS orbit and worldwide ISS naked-eye visibility dates/times, see http://www.hq.nasa.gov/osf/station/viewing/issvis.html. In addition, information on International Space Station sighting opportunities can be found at http://spaceflight.nasa.gov/realdata/sightings/ on NASA’s Human Spaceflight website. The current location of the International Space Station can be found at http://science.nasa.gov/temp/StationLoc.html at NASA’s Marshall Space Flight Center. Additional satellite tracking resources can be found at http://www.spaceref.com/iss/tracking.html.