NASA Post-MMT Meeting Images 28 July 2005

UW ET Zoom

STS-114 ORU 130 Divot Size 4

Enlarged section of enhanced imagery. Trajectory of debris particle is shown.

LH2 PAL Ramp Design Overview

Historical PAL Ramp Performance

LO2 PAL Ramp Design Overview
Orbiter Project Office Manager, Steve Poulos

Leading Edge 1

Leading Edge 2 – Possible Scuff

Leading Edge 3 – Possible Coating Damage

ISS011-E-11074 – Protruding Gap Filler

ISS011-E-11084

ISS011-E-11084 (closeup) – Protruding Gap Filler; NLGD Tile Damage

ISS011-E-11023 – Damaged Blanket

Door Tile 1

Door Tile 2

Wing Tile