NASA Mars Odyssey THEMIS Images: September 29 – October 3, 2008
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Hebrus Vallis (Released 29 September 2008)
http://themis.asu.edu/zoom-20080929a - Landslide (Released 30 September 2008)
http://themis.asu.edu/zoom-20080930a - Faulting (Released 01 October 2008)
http://themis.asu.edu/zoom-20081001a - Candor Chasma (Released 02 October 2008)
http://themis.asu.edu/zoom-20081002a - Landslide (Released 03 October 2008)
http://themis.asu.edu/zoom-20081003a
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html