NASA Mars Odyssey THEMIS Images: October 29 – November 2, 2007
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Collapse Tube (Released 29 October 2007)
http://themis.asu.edu/zoom-20071029a - Draining the Highland (Released 30 October 2007)
http://themis.asu.edu/zoom-20071030a - Dust Devil Tracks (Released 31 October 2007)
http://themis.asu.edu/zoom-20071031a - Argyre Basin Dunes (Released 01 November 2007)
http://themis.asu.edu/zoom-20071101a - More Argyre Dunes (Released 02 November 2007)
http://themis.asu.edu/zoom-20071102a
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html