NASA Mars Odyssey THEMIS Images: October 15-19, 2007
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Crater Island (Released 15 October 2007)
http://themis.asu.edu/zoom-20071015a - Crater Low (Released 16 October 2007)
http://themis.asu.edu/zoom-20071016a - Zephyr = Wind (Released 17 October 2007)
http://themis.asu.edu/zoom-20071017a - Follow The Fault (Released 18 October 2007)
http://themis.asu.edu/zoom-20071018a - Landslide (Released 19 October 2007)
http://themis.asu.edu/zoom-20071019a
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html