Status Report

NASA Mars Odyssey THEMIS Images: – June 25-29, 2012

By SpaceRef Editor
July 2, 2012
Filed under , , ,

– Wind Erosion (25 June 2012) http://themis.asu.edu/node/5922

– Chaso (26 June 2012) http://themis.asu.edu/node/5923

– Winds (27 June 2012) http://themis.asu.edu/node/5924

– Mega Gully (28 June 2012) http://themis.asu.edu/node/5925

– Pavonis Fossae (29 June 2012) http://themis.asu.edu/node/5926

All of the THEMIS images are archived here: http://themis.asu.edu/latest.html

NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

SpaceRef staff editor.