NASA Mars Odyssey THEMIS Images: June 18-22, 2007
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Russell Crater (Released 18 June 2007)
http://themis.asu.edu/zoom-20070618a - THEMIS ART #81 (Released 19 June 2007)
http://themis.asu.edu/zoom-20070619a - THEMIS ART #82 (Released 20 June 2007)
http://themis.asu.edu/zoom-20070620a - THEMIS ART #82 (Released 21 June 2007)
http://themis.asu.edu/zoom-20070621a - THEMIS ART #84 (Released 22 June 2007)
http://themis.asu.edu/zoom-20070622a
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html