NASA Mars Odyssey THEMIS Images: January 7-11, 2008
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Arcuate Collapse (Released 07 January 2008)
http://themis.asu.edu/zoom-20080107a - Ophir Chasma (Released 08 January 2008)
http://themis.asu.edu/zoom-20080108a - Landslides (Released 09 January 2008)
http://themis.asu.edu/zoom-20080109a - Channels (Released 10 January 2008)
http://themis.asu.edu/zoom-20080110a - Wind Action (Released 11 January 2008)
http://themis.asu.edu/zoom-20080111a
All of the THEMIS images are archived here: http://themis.asu.edu/latest.html