NASA Mars Odyssey THEMIS Images: December 22-26, 2008
NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.
- Platy Lava Flow (Released 22 December 2008)
http://themis.asu.edu/zoom-20081222a - Dunes (Released 23 December 2008)
http://themis.asu.edu/zoom-20081223a - Dunes (Released 24 December 2008)
http://themis.asu.edu/zoom-20081224a - Dark Slope Streak (Released 25 December 2008)
http://themis.asu.edu/zoom-20081225a - Ganges Chasma (Released 26 December 2008)
http://themis.asu.edu/zoom-20081226a
All of the THEMIS images are archived here: