Status Report

NASA Mars Odyssey THEMIS Images: April 28 – May 2, 2014

By SpaceRef Editor
May 5, 2014
Filed under , , ,

– Granicus Valles (28 April 2014) http://themis.asu.edu/zoom-20140428a

– Channels (29 April 2014) http://themis.asu.edu/zoom-20140429a

– Alluvial Fans (30 April 2014) http://themis.asu.edu/zoom-20140430a

– Lava Flows (01 May 2014) http://themis.asu.edu/zoom-20140501a

– Polar Dunes (02 May 2014) http://themis.asu.edu/zoom-20140502a

All of the THEMIS images are archive here: http://themis.asu.edu/latest.html

NASA’s Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA’s Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena.

SpaceRef staff editor.