International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/07/13 4:00 pm Central Daylight Time (CDT)
158/21:00 Greenwich Mean Time (GMT)

New Status: Multi-purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Leak Check: Flight Engineer (FE)-3 Cassidy successfully performed the final portion of the MSPR CC leak check today. He conducted a positive pressure check, which was the third and final required leak check for the Combustion Chamber. Last week he completed the a nitrogen gas supply line leak check, and on Wednesday he completed the CC leak check with negative pressure. Cassidy stowed the chamber and the work bench on which these checks were performed.

Microbiome Experiment: Following completion of their respective questionnaires, Nyberg and FE-5 Parmitano collected today’s perspiration samples immediately after exercise and inserted them in cold stowage for return to ground. They will repeat the collections tomorrow. The Microbiome experiment investigates the impact of space travel on the human immune system and an individual’s microbiome, the collection of microbes that live in and on the human body. This will help predict how long-term space travel may impact the human microbiome and health.

Skin-B Experiment: Parmitano conducted the first of five sessions of this experiment. This study investigates the mechanisms behind how skin adapts/regenerates under the influence of weightlessness and the environmental conditions in spacecraft on long duration missions.

Circadian Rhythms: Parmitano performed the first of four sessions of this experiment which examines the circadian rhythm of astronauts during long duration space flight. This includes changes in body composition and temperature, the effect of a non-24 hour light/dark cycle and reduced physical activity due to microgravity and the artificially controlled environment onboard ISS.

Ocular Heath – Cardiac Operations: Due to yesterday’s high Beta angle constraints to Ku-Band commanding and video, the Ocular Health Cardiac operations for Nyberg and Parmitano were rescheduled to today. The crewmembers performed cardiac ultrasound scans and blood pressure measurements. Ground specialists assisted with remote guidance for the ultrasound scans. The Ocular Health protocol aims to systematically gather physiological data to characterize the Risk of Microgravity-Induced Visual Impairment/Intracranial Pressure on crewmembers assigned to a 6 month ISS increment. Researchers believe that by systematically measuring visual, vascular and central nervous system changes over the course of this experiment, a database could be developed to inform future in-flight research protocols, identify mechanisms, develop countermeasures, and direct clinical monitoring and clinical practice guidelines.

Today’s Planned Tasks
– Reading REMINDER [Complete]
– BIOME- Sampling Operations [Complete]
– PROK – Urine Sample Collection [Complete]
– HRF Urine Sample Collection [Complete]
– HRF – Urine sample insertion into MELFI [Complete]
– Reminder to the crew about Circadian Rhythms experiment [Complete]
– HRF Blood Draw [Complete]
– HRF Refrigerated Centrifuge Configuration [Complete]
– Daily Planning Conference (S-band) [Complete]
– HRF – Blood sample removal from centrifuge and its deactivation [Complete]
– ISS Crew and ГОГУ (RSA Flight Control Team Management [Complete]
– BIOME – Survey Questionnaire [Complete]
– IMS Tagup (S-band)/ r/g as necessary. [Complete]
– ТКГ 419 (Aft) Stowage and IMS Ops [Complete]
– Locating EVA hardware and tools / r/g 2554 [In Work]
– BIOME – Hardware Setup and Sampling [Complete]
– ТКГ 419 (Aft) Packing Completion Status Report (S-band) / r/g 2403, 2489 [Complete]
– CIR – Hardware Setup
– WRS Water Sample Analysis
– HRF – Urine Sample MELFI Insertion [Complete]
– Removal of two Handles from ТКГ 416 Front Hatch Cover. [In work]
– SKIN B – Equipment setup nominal ops [Complete]
– ТГК 419P (AO) docking mechanism (СтМ) installation
– Crew Prep for PAO [Complete]
– PAO Hardware Setup [Complete]
– BSA battery charge – start [Complete]
– СОЖ Maintenance [In work]
– MSPR – Combustion Chamber (CC) Leak Check [Complete]
– PAO Event [Complete]
– 24-hour BP monitoring (terminate) / r/g 2526 [Complete]
– PROK – Controlled Diet Log [Complete]
– TOCA 2 Data Recording [Complete]
– PROK – Diet Log and Log Photo [Complete]
– MRM2 comm config to support voice comm during experiment [Complete]
– URAGAN. Photo Spectral System Battery Charge (start) [Complete]
– PLAZMENNIY KRISTALL. Plasma Chamber Leak Check. [Complete]
– Replacing E-K container and hose in АСУ [Complete]
– RGN-REC TK – Transfer and Replacement [Complete]
– Reconfigure Regul-Packet to Regul-OS Set 2 / SM Communications System [РТК], [Complete]
– BIOME – Setup [Complete]
– PLASMA CRYSTAL Software Installation. [Complete]
– PLAZMENNYI KRISTALL-3. Data Copy and Log File Dump r/g 2559 [Complete]
– BIOME- Sampling Operations [Complete]
– RGN – Initiate drain into EDV [Complete]
– HRF – Urine Sample MELFI Insertion [Complete]
– Restore Nominal Comm Configuration [Complete]
– URAGAN. Observation and Photography r/g 2560 [Complete]
– RGN – Terminate drain into EDV [Complete]
– ON MCC GO Filling up СрПК ТГК 419 (AO) Section 2 with N2 [Complete]
– MSPR – Combustion Chamber (CC) Leak Check [Complete]
– Multi – Purpose Small Payload Rack (MSPR) Combustion Chamber (CC) Closeout [Complete]
– Space Headaches Weekly Questionnaire [Complete]
– BIOME – Hardware Setup for the Experiment [Complete]
– Thermolab – Instrumentation Ops for Circadian Rhythms [Complete]
– BIOME – Hardware Stow after the experiment [Complete]
– Daily Planning Conference (S-band) [Complete]
– BCAT Reminder [Complete]
– Questionnaire REMINDER
– PLAZMENNIY KRISTALL. Pressure Check / r/g 2559

Task List
– CEO ops
– IMS edit
– Crew handover [Complete]
– WHC KTO replace
– WHC EDV R&R
– COL ATV LRR check
– COL TCS items repack
– Cue card trash
– N2 spare tools audit [Active]
– PMM rack labels [Active]
– P/TV audit PT5 [Complete]
– Preparation of reports for Roskosmos site
– ECON-M. Observations and Photography
– URAGAN Observations and Photography

Ground
– Nominal Commanding

Three-Day Look Ahead:
Saturday, 6/08: Crew off duty, BIOME, ARED cylinder evac
Sunday, 6/09: Crew off duty, ProK, Reaction
Monday, 6/10: OBT emergency sim, OBT ATV RVDP/RVDM drill, Crew Orientation

QUICK ISS Status – Environmental Control Group:
Component Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up

Meeting Schedule: Meeting Day Date Houston Time (CDT)
IMMT Monday June 10 CANCELLED
IMMT Thursday June 13 8:00 a.m.

SpaceRef staff editor.