NASA ISS On-Orbit Status 6 September 2010

By SpaceRef Editor
September 6, 2010
Filed under , , ,
NASA ISS On-Orbit Status 6 September 2010
http://images.spaceref.com/news/iss.99.jpg

All ISS systems continue to function nominally, except those noted previously or below. Crew rest day – US Labor Day, Canada Labour Day. Underway: Week 14 of Increment 24.

At wake-up, CDR Alex Skvortsov conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O2 generator which Maxim Suraev had installed on 10/19 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V). [The CDR again inspects the filters before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.]

FE-3 Kornienko’s morning inspection today included the weekly checkup behind ASU/toilet panel 139 in the SM (Service Module) on a fluid connector (MNR-NS) of the SM-U urine collection system, looking for potential moisture.

Upon wake-up, Shannon Walker performed a new session with the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. [The RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

FE-2 Caldwell-Dyson, FE-4 Wheelock & FE-6 Walker began another week-long activity with the post-wakeup experiment SLEEP (Sleep-Wake Actigraphy & Light Exposure during Spaceflight), 4th for Doug & Shannon, 8th for Tracy, transferring data from their Actiwatches to the HRF-1 (Human Research Facility 1) laptop. [To monitor his/her sleep/wake patterns and light exposure, the crewmember wears a special Actiwatch device which measures the light levels encountered by him/her as well as their patterns of sleep and activity throughout the Expedition, using the payload software for data logging and filling in questionnaire entries in the experiment’s laptop session file on the HRF-1 laptop. The log entries are done within 15 minutes of final awakening for seven consecutive days.]

FE-5 Yurchikhin conducted the standard STTS VHF communications test from Soyuz 23S to the ground, on UKV2 (VHF2) from SM via MRM1 Rassvet. The test was conducted at ~6:40am EDT over RGS (Russian Ground Site). [The backup opportunity 2 hrs later (~8:15am) was not required.]

Later, during overflight of RGS-21 at 11:25am-11:35am, Alex Skvortsov conducted a functionality test of the STTS UKV2 radio channel, similar to the check performed on 8/31. [RGS-21 Djusail (DJS) is located at 45.7N, 63.5E.]

Fyodor completed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]

Wheelock & Walker continued their second six-day SOLO (Sodium Loading in Microgravity) sessions, which entails a series of diet intake loggings, body mass measurements and blood & urine samplings in two session blocks. Doug is now on the High Salt diet, with daily diet log entries, Shannon on Low Salt.

Tracy conducted the T+5 day visual microbial (bacterial & fungal) analysis & data recording of surface samples collected by Shannon on 9/1 on SSK (Surface Sample Kit) slides from the WHC (Waste & Hygiene Compartment). [The colony growth on the sampling slides is inspected visually after five days of incubation, using a special procedure to analyze the SSK media slides for bacterial & fungal colony growths. Tomorrow, Doug is scheduled for the T+5 analysis of the 24 nominal samples collected by Tracy on 9/2 in Lab, SM, Node-1, Node-3 & Kibo JPM.]

In the Lab, FE-2 also worked on the CIR (Combustion Integrated Rack), removing the alignment guides to allow activation of the PaRIS (Passive Rack Isolation System) by the ground for FCF (Fluids & Combustion Facility) operations requiring a micro-G environment,

Mikhail Kornienko was up for the regular weekly maintenance of the TVIS (Treadmill with Vibration Isolation & Stabilization), primarily inspecting the condition of the SLDs (Subject Loading Devices) in contingency configuration, SLD cables for fraying and SPDs (Subject Positioning Devices), lubricating as required, plus recording time & date values.

At ~10:05am, Wheels had his weekly PFC (Private Family Conference) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop).

The crew worked out on today’s 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (FE-2, FE-6), TVIS treadmill with vibration isolation (CDR/2x, FE-3, FE-5), ARED advanced resistive exercise device (FE-2, FE-3, FE-4, FE-5, FE-6), and T2/COLBERT advanced treadmill (FE-4). [T2 snubber arm inspection is no longer needed after the last T2 session of the day; it is now being done only once a week after the last T2 session.]

Jobs listed for Skvortsov, Fyodor & Kornienko today on the Russian discretionary “time permitting” task list were –

  • Another ~30-min. run of the GFI-8 "Uragan" (hurricane) earth-imaging program with the NIKON D3X digital camera photography with Sigma AF 300-800mm telelens, shooting the Pamir Glacier, large glaciers east of Lake Issyk-Kul, oil contamination in the Caspian Sea, Aral Sea, and fire status in the Volgograd and Samara regions,
  • A ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop, and
  • A ~15-min. photography session for the DZZ-13 “Seiner” ocean observation program, obtaining NIKON D3 photos with Nikkor 80-200 mm lens and the SONY HD video camcorder on oceanic water blooms in the southeast Pacific and central-eastern Atlantic areas, then copying the images to the RSK-1 laptop.

No CEO (Crew Earth Observation) photo targets uplinked for today.

ISS Orbit (as of this morning, 7:56am EDT [= epoch])
Mean altitude – 354.5 km
Apogee height – 360.0 km
Perigee height – 349.1 km
Period — 91.63 min.
Inclination (to Equator) — 51.65 deg
Eccentricity — 0.0008129
Solar Beta Angle — 10.9 deg (magnitude decreasing)
Orbits per 24-hr. day — 15.71
Mean altitude loss in the last 24 hours – 75 m
Revolutions since FGB/Zarya launch (Nov. 98) – 67,625.

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations—————–
09/06/10 — Progress M-06M/38P deorbit – ~8:06am EDT
09/08/10 — Progress M-07M/39P launch – 7:11am EDT
09/10/10 — Progress M-07M/39P docking – ~8:37am EDT
09/xx/10 — ISS reboost
09/24/10 — Soyuz TMA-18/22S undock/landing (End of Increment 24; CDR-25 – Wheelock)
————–Three-crew operations————-
10/08/10 — Soyuz TMA-20/24S launch – Kelly (CDR-26)/Kaleri/Skripochka
10/10/10 — Soyuz TMA-20/24S docking
————–Six-crew operations————-
10/26/10 — Progress M-05M/37P undock
10/27/10 — Progress M-08M/40P launch
10/29/10 — Progress M-08M/40P docking
11/01/10 — STS-133/Discovery launch (ULF5 – ELC4, PMM) ~4:33pm EDT
11/12/10 — Russian EVA-26
11/17/10 — Russian EVA-27
11/30/10 — Soyuz TMA-19/23S undock/landing (End of Increment 25)
————–Three-crew operations————-
12/14/10 — Soyuz TMA-21/25S launch – Kondratyev (CDR-27)/Coleman/Nespoli
12/16/10 — Soyuz TMA-21/25S docking
————–Six-crew operations————-
12/20/10 — Progress M-07M/39P undock
01/24/10 — Progress M-08M/40P undock
01/28/10 — Progress M-09M/41P launch
01/31/10 — Progress M-09M/41P docking
02/xx/10 — Russian EVA-28
02/26/11 — STS-134/Endeavour (ULF6 – ELC3, AMS-02) ~4:19pm EDT“target”
03/16/11 — Soyuz TMA-20/24S undock/landing (End of Increment 26)
————–Three-crew operations————-
03/30/11 — Soyuz TMA-22/26S launch – A. Borisienko (CDR-28)/R.Garan/A.Samokutayev
04/01/11 — Soyuz TMA-22/26S docking
————–Six-crew operations————-
04/26/11 — Progress M-09M/41P undock
04/27/11 — Progress M-10M/42P launch
04/29/11 — Progress M-10M/42P docking
05/xx/10 — Russian EVA-29
05/16/11 — Soyuz TMA-21/25S undock/landing (End of Increment 27)
————–Three-crew operations————-
05/30/11 — Soyuz TMA-23/27S launch – M. Fossum (CDR-29)/S. Furukawa/S. Volkov
06/01/11 — Soyuz TMA-23/27S docking
————–Six-crew operations————-
06/21/11 — Progress M-11M/43P launch
06/23/11 — Progress M-11M/43P docking
08/29/11 — Progress M-11M/43P undocking
08/30/11 — Progress M-12M/44P launch
09/01/11 — Progress M-12M/44P docking
09/16/11 – Soyuz TMA-22/26S undock/landing (End of Increment 28)
————–Three-crew operations————-
09/30/11 — Soyuz TMA-24/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/S.Revin
10/02/11 – Soyuz TMA-24/28S docking
————–Six-crew operations————-
10/20/11 — Progress M-10M/42P undocking
10/21/11 — Progress M-13M/45P launch
10/23/11 — Progress M-13M/45P docking
11/16/11 — Soyuz TMA-23/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — Soyuz TMA-25/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/02/11 — Soyuz TMA-25/29S docking
————–Six-crew operations—————-
12/??/11 — 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 — Progress M-13M/45P undock
03/14/12 — Soyuz TMA-24/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/26/12 — Soyuz TMA-26/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Valkov
03/28/12 — Soyuz TMA-26/30S docking
————–Six-crew operations—————-
05/15/12 — Soyuz TMA-25/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-27/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-27/31S docking
————–Six-crew operations—————-
09/09/12 — Soyuz TMA-26/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/23/12 — Soyuz TMA-28/32S launch – K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin
09/25/12 – Soyuz TMA-28/32S docking
————–Six-crew operations————-
10/07/12 — Soyuz TMA-27/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-29/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
11/xx/12 – Soyuz TMA-29/33S docking
————–Six-crew operations————-
03/xx/12 — Soyuz TMA-28/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/12 – Soyuz TMA-30/34S launch.
03/xx/12 – Soyuz TMA-30/34S docking
————–Six-crew operations————-