Status Report

NASA ISS On-Orbit Status 6 November 2011

By SpaceRef Editor
November 5, 2011
Filed under , , ,
NASA ISS On-Orbit Status 6 November 2011
http://images.spaceref.com/news/iss.104.jpg

All ISS systems continue to function nominally, except those noted previously or below. Saturday – Crew off duty.

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew off duty. Ahead: Week 8 of Increment 29 (three-person crew)

After wakeup, FE-4 Volkov performed the routine inspection of the SM (Service Module) PSS Caution & Warning panel as part of regular Daily Morning Inspection.

CDR Fossum checked the running BCAT-6 (Binary Colloidal Alloy Test-6)-Phase Separation experiment for camera & flashlight battery charge and again 8 hrs later at midday and before sleeptime. The Nikon D2Xs camera with EarthKAM software running with the Intervalometer on SSC-18 is taking automated flash photography. [The camera is running for a total of 7 days, taking one photo each hour of Sample 2 (since 11/2). Camera battery change and Intervalometer restart is done three times a day. Objective of BCAT-6-Phase Separation: to gain unique insights into how gas and liquid phases separate and come together in microgravity. These fundamental studies on the underlying physics of fluids could provide the understanding needed to enable the development of less expensive, longer shelf-life household products, foods, and medicines.]

Sergey Volkov conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM. This included the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow, as well as the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s & FGB’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for calldown. [SOZh servicing includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

In COL (Columbus Orbital Facility), FE-5 Furukawa made room in front of the HRF-2 (Human Research Facility 2) Rack location at bay A4, then set up the equipment for his 4th and final ICV (Integrated Cardiovascular) Ambulatory Monitoring session starting tomorrow, initializing two Actiwatch “Spectrum” units and formatting two HiFi CF cards. Satoshi’s 2nd and final ICV Echo Scan session will then follow on 11/10.

FE-4 & FE-5 had their weekly PFCs (Private Family Conferences) on today’s schedule, via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Satoshi at ~4:30am, Sergey at ~6:10am EST.

Mike Fossum has a PSC (Private Special Conference) on his schedule for 2:30pm.

The crew worked out with their regular 2-hr physical exercise protocol on the TVIS treadmill with vibration isolation & stabilization (FE-4/2x), ARED advanced resistive exercise device (CDR, FE-5), and T2/COLBERT advanced treadmill (CDR, FE-5).

Tasks listed for Sergey Volkov on the Russian discretionary “time permitting” job for today were –
Continuing the preparation & downlinking of more reportages (written text, photos, videos) for the Roskosmos website to promote Russia’s manned space program (max. file size 500 Mb),
A 10-min. photography session for the DZZ-13 “Seiner” ocean observation program, obtaining HDV (Z1) camcorder footage of bio-luminescent glow of high-production zones in the Eastern Central Atlantic Ocean, then copying the images to the RSK-1 laptop,
Conducting the daily inspection of the running Russian BIO-5 Rasteniya-2 (“Plants-2”) payload with its LADA-01 greenhouse, verifying proper watering of the KM A32 & A24 root modules, and
Another ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop.

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 7:07am EST [= epoch])
Mean altitude – 388.6 km
Apogee height – 403.3 km
Perigee height – 373.8 km
Period — 92.33 min.
Inclination (to Equator) — 51.64 deg
Eccentricity — 0.0021859
Solar Beta Angle — -50.6 deg (magnitude increasing)
Orbits per 24-hr. day — 15.60
Mean altitude loss in the last 24 hours – 10 m
Revolutions since FGB/Zarya launch (Nov. 98) — 74,311
Time in orbit (station) – 4734 days
Time in orbit (crews, cum.) — 4021 days

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Three-crew operations (Increment 29)————-
11/13/11 — Soyuz TMA-03M/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin (11:14pm EST)
11/16/11 — Soyuz TMA-03M/28S docking (MRM2) (~12:45am)
————–Six-crew operations————-
11/22/11 — Soyuz TMA-02M/27S undock/landing (End of Increment 29) (~9:21pm)
————–Three-crew operations————-
12/xx/11 — SpaceX Falcon 9/Dragon — (Under Review)
12/21/11 — Soyuz TMA-04M/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit — (Target Date)
12/23/11 — Soyuz TMA-04M/29S docking (MRM1) — (Target Date)
————–Six-crew operations—————-
TBD — Progress M-13M/45P undock
TBD — Progress M-14M/46P launch
TBD — Progress M-14M/46P docking (DC-1)
02/29/12 — ATV3 launch readiness
TBD — Soyuz TMA-03M/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/xx/12 — Soyuz TMA-05M/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Volkov — (Target Date)
04/xx/12 — Soyuz TMA-05M/30S docking (MRM2) — (Target Date)
————–Six-crew operations—————-
05/05/12 — 3R Multipurpose Laboratory Module (MLM) w/ERA – launch on Proton (under review)
05/06/12 — Progress M-14M/46P undock
05/07/12 — 3R Multipurpose Laboratory Module (MLM) – docking (under review)
05/xx/12 — Soyuz TMA-04M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/xx/12 – Soyuz TMA-06M/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/xx/12 – Soyuz TMA-06M/31S docking
————–Six-crew operations—————-
09/xx/12 — Soyuz TMA-05M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
10/xx/12 — Soyuz TMA-07M/32S launch – K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
10/xx/12 – Soyuz TMA-07M/32S docking
————–Six-crew operations————-
11/xx/12 — Soyuz TMA-06M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-08M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/xx/12 – Soyuz TMA-08M/33S docking
————–Six-crew operations————-
03/xx/13 — Soyuz TMA-07M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/13 – Soyuz TMA-09M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/xx/13 – Soyuz TMA-09M/34S docking
————–Six-crew operations————-
05/xx/13 – Soyuz TMA-08M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/xx/13 – Soyuz TMA-10M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/xx/13 – Soyuz TMA-10M/35S docking
————–Six-crew operations————-
09/xx/13 – Soyuz TMA-09M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 – Soyuz TMA-11M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 – Soyuz TMA-11M/36S docking
————–Six-crew operations————-
11/xx/13 – Soyuz TMA-10M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 – Soyuz TMA-12M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 – Soyuz TMA-12M/37S docking
————–Six-crew operations————-
03/xx/14 – Soyuz TMA-11M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-

SpaceRef staff editor.