Status Report

NASA ISS On-Orbit Status 5 August 2012

By SpaceRef Editor
August 5, 2012
Filed under , , ,
NASA ISS On-Orbit Status 5 August 2012
http://images.spaceref.com/news/iss.104.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew off duty. Ahead: Week 6 of Increment 32 (six-person crew).

At wakeup, Gennady Padalka performed the routine inspection of the SM (Service Module) PSS Caution & Warning panel as part of regular Daily Morning Inspection.

Sergei Revin completed the routine daily & weekly servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM and FGB. [This included the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings of SM & FGB for calldown to TsUP-Moscow, as well as the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s & FGB’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for calldown. SOZh servicing includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers as required.]

Suni Williams closed the protective shutters of the Lab, Node-3/Cupola & JPM (JEM Pressurized Module) windows in preparation for tonight’s planned HTV3 EP (H-II Transfer Vehicle 3 Exposed Platform) hand-off by SSRMS (Space Station Remote Manipulator) to the JEM RMS (Robotic Maneuvering System).

At ~5:40am, Padalka, Revin & Malenchenko joined for a PAO TV downlink, extending greetings & congratulations for the celebration of the 100th Anniversary of Russia’s Air Force (8/12).

At ~6:05am, Sunita powered up the SM’s amateur radio equipment (Kenwood VHF transceiver with manual frequency selection, headset, & power supply) and at 6:20am conducted a ham radio session with participants in Space Jam 6 at the Octave Chanute Aerospace Museum.

FE-2, FE-3 & FE-6 conducted their weekly PFCs (Private Family Conferences), via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Aki at ~3:45am, Sergei at ~7:40am, Joe at ~3:20pm EDT.

The crew worked out on the CEVIS cycle ergometer with vibration isolation (FE-3, FE-6), TVIS treadmill with vibration isolation & stabilization (CDR, FE-2, FE-4), ARED advanced resistive exerciser (FE-2, FE-3, FE-5, FE-6), T2/COLBERT advanced treadmill (FE-5), and VELO ergometer bike with load trainer (CDR, FE-4).

Suni recorded her session on the T2/COLBERT advanced treadmill with the G1 camera and MPC (Multi-Protocol Converter) downlink.

Tasks listed for Revin, Malenchenko & Padalka on the Russian discretionary “time permitting” job for today were –

* A ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop,
* A 10-min. photography session for the DZZ-13 “Seiner” ocean observation program, obtaining HDV (Z1) camcorder footage of color bloom patterns in the waters of Central-Eastern Atlantic and coastal Africa, then copying the images to the RSK-1 laptop, and
* More preparation & downlinking of reportages (written text, photos, videos) for the Roskosmos website to promote Russia’s manned space program (max. file size 500 Mb).

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations—————-
08/16/12 — Russian EVA-31
08/30/12 — US EVA-18
09/06/12 — HTV3 undocking
09/08/12 — HTV3 reentry
09/17/12 — Soyuz TMA-04M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/25/12 — ATV3 undocking
10/15/12 — Soyuz TMA-06M/32S launch – K.Ford (CDR-34)/O.Novitsky/E.Tarelkin
10/17/12 — Soyuz TMA-06M/32S docking
————–Six-crew operations————-
11/01/12 — Progress M-17M/49P launch
11/03/12 — Progress M-17M/49P docking
11/12/12 — Soyuz TMA-05M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
12/05/12 — Soyuz TMA-07M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/07/12 — Soyuz TMA-07M/33S docking
————–Six-crew operations————-
12/26/12 — Progress M-18M/50P launch
12/28/12 — Progress M-18M/50P docking
03/19/13 — Soyuz TMA-06M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
04/02/13 — Soyuz TMA-08M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
04/04/13 — Soyuz TMA-08M/34S docking
————–Six-crew operations————-
05/16/13 — Soyuz TMA-07M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/29/13 — Soyuz TMA-09M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/31/13 — Soyuz TMA-09M/35S docking
————–Six-crew operations————-
09/xx/13 — Soyuz TMA-08M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 — Soyuz TMA-10M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 — Soyuz TMA-10M/36S docking
————–Six-crew operations————-
11/xx/13 — Soyuz TMA-09M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 — Soyuz TMA-11M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 — Soyuz TMA-11M/37S docking
————–Six-crew operations————-
03/xx/14 — Soyuz TMA-10M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-

SpaceRef staff editor.