Status Report

NASA ISS On-Orbit Status 3 October 2011

By SpaceRef Editor
October 3, 2011
Filed under , , ,
NASA ISS On-Orbit Status 3 October 2011
http://images.spaceref.com/news/iss.101.jpg

All ISS systems continue to function nominally, except those noted previously or below. Underway: Week 3 of Increment 29 (three-person crew).

FE-4 Sergei Volkov performed the routine checkup of the SM (Service Module) PSS Caution & Warning panel as part of the regular Daily Morning Inspection.

Sergei also conducted the weekly checkup behind ASU/toilet panel 139 in the SM on a fluid connector (MNR-NS) of the SM-U urine collection system, looking for potential moisture.

At wake-up, CDR Mike Fossum & FE-5 Satoshi Furukawa completed another post-sleep session of the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. [RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

First thing in Post-sleep, Furukawa & Fossum undertook their 16th weekly U.S. “Bisphosphonates” biomedical countermeasures session, ingesting an Alendronate pill before breakfast. The required ~10h fast period started for them last night. This is usually done on Mondays. [The Bisphosphonates study should determine whether antiresorptive agents (that help reduce bone loss) in conjunction with the routine in-flight exercise program will protect ISS crewmembers from the regional decreases in bone mineral density documented on previous ISS missions. Two dosing regimens are being tested: (1) an oral dose of 70 mg of Alendronate taken weekly starting 3 weeks prior to flight and then throughout the flight and (2) an intravenous (IV) dose of 4 mg Zoledronic Acid, administered just once approximately 45 days before flight. The rationale for including both Alendronate and Zoledronic Acid is that two dosing options will maximize crew participation, increase the countermeasure options available to flight surgeons, increase scientific opportunities, and minimize the effects of operational and logistical constraints. The primary measurement objective is to obtain preflight and postflight QCT (Quantitative Computed Tomography) scans of the hip. The QCT scans will provide volumetric bone density information of both cortical and trabecular (spongy) bone regions of the hip.]

Volkov performed the periodic maintenance of the active Russian BMP Harmful Impurities Removal System, starting the “bake-out” cycle to vacuum on absorbent bed #1 of the regenerable dual-channel filtration system. The process will be terminated later today (~5:15pm EDT), followed tomorrow by Bed #2 regeneration. (Done last time: 9/13-9/14.) [Regeneration of each of the two cartridges takes about 12 hours and is conducted only during crew awake periods. The BMP’s regeneration cycle is normally done every 20 days.]

Sergei also completed the daily inspection of the recently activated Russian BIO-5 Rasteniya-2 (“Plants-2”) payload with its LADA-01 greenhouse, verifying proper watering of the KM A32 & A24 root modules and taking the weekly documentary photography of setup & activities. [Rasteniya-2 researches growth and development of plants (currently wheat) under spaceflight conditions in the LADA greenhouse from IBMP (Institute of Bio-Medical Problems, Russian: IMBP).]

Fossum began the periodic HRF (Human Research Facility) generic NUTRITION/Repository 24-hr urine collection period, his 2nd, with samples deposited in MELFI (Minus Eighty Laboratory Freezer for ISS). Later in the day, Mike set up the equipment for the associated blood collection, scheduled tomorrow with Satoshi Furukawa’s assistance as operator. [The operational products for blood & urine collections for the HRP (Human Research Program) payloads were revised some time ago, based on crew feedback, new cold stowage hardware, and IPV capabilities. Generic blood & urine procedures have been created to allow an individual crewmember to select their payload complement and see specific requirements populated. Individual crewmembers will select their specific parameter in the procedures to reflect their science complement. Different crewmembers will have different required tubes and hardware configurations, so they must verify their choice selection before continuing with operations to ensure their specific instruction.]

Afterwards, CDR Fossum serviced the running BCAT-5 (Binary Colloidal Alloy Test-5) experiment, checking camera operations during the day and changing the camera battery in the morning and before sleeptime (change required after 8 hrs). [The new experiment session is with a Harvard University phase separation sample using a different setup than for the recent crystal samples 9 & 10, mainly requiring an SSC (Station Support Computer) laptop with EarthKAM timing software, power cables and camera USB cable. For illumination, the Mini-MagLite and Flash batteries do not need to be changed yet, but the camera will need a freshly charged battery. After Mike started the run on 9/21 by mixing the sample (#4) for phase separation and taking test photos, the EarthKAM (Earth Knowledge Acquired by Middle School Students) software on the SSC-13 laptop began taking pictures of Sample 4 for 13 days at different intervals throughout the run. This requires camera battery changes twice a day and image check with a battery change once per day. BCAT-5 is operating in the JPM (JEM Pressurized Module) because some time ago the crew deemed the US Lab too crowded for running it.]

After last Saturday’s (10/1) review and teleconference with “PLUTO” team specialists, FE-5 Furukawa had ~2h15m set aside for working in the Node-2 to remove & replace the ISL (Integrated Station LAN) network Router. [After preparing worksite and equipment, Satoshi’s activities in Node-2 involved the physical replacement of the ISL Router with the new unit, then relocating two wireless laptops (SSC-9 & SSC-11) to Node-2 and connecting them, after which ground controllers used them to configure the new ISL Router. Satoshi then disconnected the two SSC laptops for return to their nominal locations.]

After removing stowage from in front of the HRF-1 (Human Research Facility 1) Rack & HRF-2 locations in COL (Columbus Orbital Laboratory, F4 & A4) to gain access to the rack, FE-6 Fossum powered on the USND-2 (Ultrasound 2) and VPC (Video Power Converter) hardware, connected VPC to HRF-1, and performed his FD115 (Flight Day 115) SPRINT leg muscle self scan with remote guidance from the ground team. [Afterwards, Mike powered off the hardware, decabled the VPC from HRF Rack-1, and stowed the hardware. Fossum is currently following a special experimental “SPRINT” protocol which diverts from the regular 2.5hrs per day regime and introduces special daily sessions, followed by the USND scan. No exercise is being timelined for Fridays. If any day is not completed, Mike picks up where he left off, i.e., he would be finishing out the week with his last day of exercise on his off day.]

FE-4 Volkov started a new session, his 2nd, with the standard 24-hour ECG (electrocardiogram) recording under the Russian MedOps PZE MO-2-2 protocol which monitors human cardiovascular performance in the space flight environment. [After 24 hrs of ECG recording and blood pressure measurements with the Kardiomed (CDM) system, Sergei will doff the five-electrode Holter harness that read his dynamic (in motion) heart function from two leads and recorded on the “Kardioregistrator 90205” unit. The examination results will then be downloaded from the Holter ECG device to the RSE-Med laptop, controlled by the Kardiomed application. Later, the data will be downlinked as a compressed .zip-file via OCA.]

Later, Volkov undertook his 5th session with the Russian behavioral assessment TIPOLOGIA (MBI-20), setting up the workstation, connecting equipment, suiting up and launching the program on the RSK1 laptop. [A crewmember stood by to assist Sergei in donning the electrode cap, preparing the head for the electrodes, applying electrode gel from the Neurolab-RM2 kit and taking documentary photography. Data were recorded on a PCMCIA memory card and downlinked via OCA comm. MBI-20 studies typological features of operator activity of the ISS crews in long-term space flight phases, with the subject using a cap with EEG (electroencephalogram) electrodes. The experiment, which records EEGs, consists of the Luescher test, “adaptive biological control” training, and the games Minesweeper and Tetris. The Luescher color diagnostic is a psychological test which measures a person’s psychophysical state, his/her ability to withstand stress, to perform and to communicate. It is believed to help uncover the cause of psychological stress, which can lead to physical symptoms. An EEG measures and records the electrical activity of the brain.]

Furukawa performed another session with the psychological POMS (Profile of Mood States) experiment, completing his questionnaire for downlink to ground specialist.

In the JAXA Kibo JPM (JEM Pressurized Module), Satoshi also serviced the FPEF MS (Fluid Physics Experiment Facility / Marangoni Surface) payload by removing & replacing 5 HDs (hard disks) of the IPU VRU (Image Processing Unit / Video Recording Unit),- #1091, #1092, #1093, #1094, #1095. [The replaced VRU disks (#1086, #1087, #1088, #1089, #1090) were put in a Ziploc bag for return to SSIPC (Space Station Integration & Promotion Center/Tsukuba)].

Activities completed by Sergei Volkov included –
* The periodic (every Monday) verification of the automatic IUS AntiVirus program on the Russian VKS auxiliary network laptops RSS1, RSS2, RSK1-T61p & RSK2, as well as the manual update on the non-network laptops RSE-Med & RSE1; [antivirus update procedures have changed since the recent SSCV4 software update. Before the recent (8/8) installation of the new automated procedure, the refresh was done manually on Mondays on RSS2, copying the files to the RSS2 service folder, then launching update scripts on the network laptops RSS1, RSK1-T61p & RSK2 and finally manually updating non-network laptops RSE-Med & RSE1. On Tuesdays, the anti-virus scanning results are regularly verified on all laptops. Nominally, Russian network laptops have software installed for automatic anti-virus update; fresh data is copied on RSK1-T61p & RRSK2 every time a computer is rebooted with a special login, and on RSS1 once daily. On Russian non-network laptops antivirus definition file update is done by the crew once every two weeks on Monday],

* Another hour of stowing new disposable cargo and equipment on Progress M-10M/42P, to be undocked on 10/29 for destructive reentry,

* Conducting the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM; [regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers, replacement of EDV-SV waste water and EDV-U urine containers and filling EDV-SV, KOV (for Elektron), EDV-ZV & EDV on RP flow regulator], and

* Working from the Russian discretionary “time permitting” task list to complete the daily IMS (Inventory Management System) maintenance, updating/editing its standard “delta file” including stowage locations, for the regular weekly automated export/import to its three databases on the ground (Houston, Moscow, Baikonur).

Satoshi Furukawa performed regular maintenance on the ARED (Advanced Resistive Exercise Device), inspecting and greasing its VIS (Vibration Isolation System) Y- & Z-axes rails & rollers and upper stops.

At ~10:40am, FE-5 powered up the SM’s amateur radio equipment (Kenwood VHF transceiver with manual frequency selection, headset, & power supply) and at 10:45am conducted a ham radio session with students at school with S. K. Sri Hartamas, Kuala Lumpur, Malaysia. [The National Space Challenge program was created to instill the talents and desire in students especially in the primary school Standard 4 level in understanding astronomy and space sciences. This program is organized annually by the Malaysian National Space Agency in cooperation with Ministry of Education as a part of school curriculum.]

Before “Presleep” period tonight, the CDR turns on the MPC and starts the Ku-band data flow of video recorded during the day to the ground, with POIC (Payload Operations & Integration Center) routing the onboard HRDL (High-Rate Data Link). After about an hour, Mike will turn MPC routing off again. [This is a routine operation which regularly transmits HD onboard video (live or tape playback) to the ground on a daily basis before sleeptime.]

Tasks listed for Sergei Volkov on the Russian discretionary “time permitting” job for today were –

* Continuing the preparation & downlinking of more reportages (written text, photos, videos) for the Roskosmos website to promote Russia’s manned space program (max. file size 500 Mb), and

* Another ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop.

The crew worked out with their regular 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (FE-5), TVIS treadmill with vibration isolation & stabilization (FE-4), ARED advanced resistive exercise device (CDR, FE-4, FE-5), and T2/COLBERT advanced treadmill (CDR). Earlier, Mike set up the video camera in Node-3 to cover the workout sessions of himself & Satoshi on the ARED, to meet the regular 30-day requirement for biomechanical evaluation of the on-orbit crewmembers, and evaluation of the hardware status.

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 8:23am EDT [= epoch])
* Mean altitude – 387.0 km
* Apogee height – 398.2 km
* Perigee height – 375.8 km
* Period — 92.30 min.
* Inclination (to Equator) — 51.64 deg
* Eccentricity — 0.0016561
* Solar Beta Angle — 21.1 deg (magnitude increasing)
* Orbits per 24-hr. day — 15.60
* Mean altitude loss in the last 24 hours — 204 m
* Revolutions since FGB/Zarya launch (Nov. 98) — 73,782
* Time in orbit (station) — 4700 days
* Time in orbit (crews, cum.) — 3987 days

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Three-crew operations (Increment 29)————-
10/19/11 — ISS Reboost
10/29/11 — Progress M-10M/42P undocking
10/30/11 — Progress M-13M/45P launch
11/01/11 — Progress M-13M/45P docking
11/14/11 — Soyuz TMA-03M/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin
11/16/11 — Soyuz TMA-03M/28S docking (MRM2)
————–Six-crew operations————-
11/22/11 — Soyuz TMA-02M/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — SpaceX Falcon 9/Dragon — Target date
12/26/11 — Soyuz TMA-04M/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit — (date “on or about”)
12/28/11 — Soyuz TMA-04M/29S docking (MRM1) — (date “on or about”)
————–Six-crew operations—————-
TBD — Progress M-13M/45P undock
TBD — Progress M-14M/46P launch
TBD — Progress M-14M/46P docking (DC-1)
02/29/12 — ATV3 launch readiness
TBD — Soyuz TMA-03M/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/xx/12 — Soyuz TMA-05M/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Volkov
04/xx/12 — Soyuz TMA-05M/30S docking (MRM2)
————–Six-crew operations—————-
05/05/12 — 3R Multipurpose Laboratory Module (MLM) w/ERA – launch on Proton (under review)
05/06/12 — Progress M-14M/46P undock
05/07/12 — 3R Multipurpose Laboratory Module (MLM) – docking (under review)
05/xx/12 — Soyuz TMA-04M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/xx/12 – Soyuz TMA-06M/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/xx/12 – Soyuz TMA-06M/31S docking
————–Six-crew operations—————-
09/xx/12 — Soyuz TMA-05M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
10/xx/12 — Soyuz TMA-07M/32S launch – K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
10/xx/12 – Soyuz TMA-07M/32S docking
————–Six-crew operations————-
11/xx/12 — Soyuz TMA-06M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-08M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/xx/12 – Soyuz TMA-08M/33S docking
————–Six-crew operations————-
03/xx/13 — Soyuz TMA-07M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/13 – Soyuz TMA-09M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/xx/13 – Soyuz TMA-09M/34S docking
————–Six-crew operations————-
05/xx/13 – Soyuz TMA-08M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/xx/13 – Soyuz TMA-10M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/xx/13 – Soyuz TMA-10M/35S docking
————–Six-crew operations————-
09/xx/13 – Soyuz TMA-09M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 – Soyuz TMA-11M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 – Soyuz TMA-11M/36S docking
————–Six-crew operations————-
11/xx/13 – Soyuz TMA-10M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 – Soyuz TMA-12M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 – Soyuz TMA-12M/37S docking
————–Six-crew operations————-
03/xx/14 – Soyuz TMA-11M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-

SpaceRef staff editor.