NASA ISS On-Orbit Status 3 August 2008

By SpaceRef Editor
August 3, 2008
Filed under , , ,
NASA ISS On-Orbit Status 3 August 2008
http://images.spaceref.com/news/iss.57.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – rest day for CDR Volkov, FE-1 Kononenko & FE-2 Chamitoff. Ahead: Week 16 of Increment 17.

Gregory Chamitoff started out on Part 2 of his session with the NASA/JSC experiment NUTRITION w/Repository. This is an all-day session, the third for Greg, of collecting urine samples several times for 24 hrs through first void tomorrow morning. [The NUTRITION project is the most comprehensive in-flight study done by NASA to date of human physiologic changes during long-duration space flight. It includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes, expanding the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by supercold MELFI dewars), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.]

Sergey Volkov conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]

The crew completed their regular 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exercise device (CDR, FE-1, FE-2), and VELO bike with bungee cord load trainer (CDR, FE-1).

Working off his suggested “time permitting” task list, FE-1 Kononenko conducted another session of the Russian GFI-8 "Uragan" (hurricane) earth-imaging program, using the D2X digital camera with the F800 telephoto lens. [Uplinked target areas were Patagonian glaciers and icebergs near South Georgia Island.]

Also working from the discretionary task list, Oleg conducted another run of the Russian DZZ-2 "Diatomeya" ocean observations program, using the NIKON-F5 DCS still camera and the HDV (high-definition) video camcorder from SM window 8 for ~20 min to record high production water areas for obtaining data on color field composition in dynamic regions of the ocean and in near-estuary areas of large rivers, plus the current cloud cover above these waters, its rating, and special forms of cloud formation.

For the CDR, a discretionary task list job was another session for Russia’s Environmental Safety Agency (EKON), making observations and taking KPT-3 aerial photography of environmental conditions of the Indian Ocean (Chagos Archipelago) and the New Zealand islands coastal area.

An additional job on the Russian voluntary task list for Kononenko was to perform the regular status check on the BIO-5 Rasteniya-2 ("Plants-2") experiment which researches growth and development of plants (peas) under spaceflight conditions in the Lada-13 greenhouse from IBMP (Institute of Bio-Medical Problems {Russian: IMBP}).

SHERE VolSci Update: Note to Gregory: “Magnificent! The SHERE team is ecstatic about your two successful test runs yesterday. As far as the team knows, you are the first person to successfully deploy a rheological fluid column in space. Congratulations!”

No CEO (Crew Earth Observations) photo targets uplinked for today.

CEO photography can be studied at this “Gateway” website:
http://eol.jsc.nasa.gov (as of 3/1/08, this database contained 757,605 views of the Earth from space, with 314,000 from the ISS alone).

Significant Events Ahead (all dates Eastern Time, some changes possible.):
08/13/08 — ATV Reboost
08/30/08 — Progress M-64/29P undocking, from FGB nadir
09/05/08 — ATV1 undocking, from SM aft port (loiter until ~9/25 for nighttime reentry/observation)
09/10/08 — Progress M-65/30P launch
09/12/08 — Progress M-65/30P docking (SM aft port)
10/01/08 — NASA 50 Years (official)
10/08/08 — STS-125/Atlantis Hubble Space Telescope Service Mission 4 (SM4)
10/11/08 — Progress M-65/30P undocking (from SM aft port)
10/12/08 — Soyuz TMA-13/17S launch
10/14/08 — Soyuz TMA-13/17S docking (FGB nadir port)
10/23/08 — Soyuz TMA-12/16S undocking (DC1 nadir)
11/10/08 — STS-126/Endeavour/ULF2 launch – MPLM Leonardo, LMC
11/12/08 — STS-126/Endeavour/ULF2 docking
11/20/08 — ISS 10 Years
11/26/08 — Progress M-66/31P launch
11/28/08 — Progress M-66/31P docking
02/10/09 — Progress M-67/32P launch
02/12/09 — Progress M-67/32P docking
02/12/09 — STS-119/Discovery/15A launch – S6 truss segment
03/25/09 — Soyuz TMA-14/18S launch
05/15/09 — STS-127/Endeavour/2J/A launch – JEM EF, ELM-ES, ICC-VLD
07/30/09 — STS-128/Atlantis/17A – MPLM(P), last crew rotation
05/27/09 — Six-person crew on ISS (following Soyuz 19S docking, May ’09)
10/15/09 — STS-129/Discovery/ULF3 – ELC1, ELC2
12/10/09 — STS-130/Endeavour/20A – Node-3 + Cupola
02/11/10 — STS-131/Atlantis/19A – MPLM(P)
04/08/10 — STS-132/Discovery/ ULF4 – ICC-VLD, MRM1
05/31/10 — STS-133/Endeavour/ULF5 – ELC3, ELC4 (contingency).