Status Report

NASA ISS On-Orbit Status 26 September 2010

By SpaceRef Editor
September 26, 2010
Filed under , , ,
NASA ISS On-Orbit Status 26 September 2010
http://images.spaceref.com/news/iss.97.jpg

All ISS systems continue to function nominally, except those noted previously or below.
Sunday – crew rest day. Ahead: Week 1 of Increment 25.

At wake-up, FE-5 Yurchikhin conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O2 generator which Maxim Suraev had installed on 10/19 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V). [FE-5 again inspects the filters before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.]

Upon wake-up, FE-6 Walker performed a new session with the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. [The RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

The three station residents completed the regular weekly three-hour task of thorough cleaning of their home, including COL (Columbus Orbital Laboratory) and Kibo JPM (JEM Pressurized Module). ["Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of the uborka house cleaning, FE-5 conducted regular maintenance inspection & cleaning of fan screens in the FGB (TsV2) and Group E fan grills in the SM (VPkhO, FS5, FS6, VP).

The Russian Flight Engineer also performed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM (Service Module), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]

Fyodor’s servicing activities included the periodic checkup of the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP.

In the Soyuz TMA-19/23S spacecraft, docked at the MRM1 Rassvet module, Yurchikhin deactivated the GA/Gas Analyzer.

FE-6 completed the regular bi-monthly reboots of the OCA Router & FS SSC (File Server Station Support Computer) laptops (the latter required to mitigate the problem of iPV and OSTPV not opening up procedures due to a memory leak in the “Tomcat” software). After a period of no less than 10 min later, Shannon also rebooted the two ISS network servers (SERVER1 & 2).

At ~8:30am EDT, the crew conducted their regular WPC (Weekly Planning Conference) with the ground, discussing next week’s "Look-Ahead Plan" (prepared jointly by MCC-H and TsUP-Moscow timeline planners), via S-band/audio, reviewing upcoming activities and any concerns about future on-orbit events.

All crewmembers have their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Fyodor at ~10:40am, Wheels at ~11:30am & 4:20pm, Shannon at ~1:30pm EDT.

The crew worked out on today’s 2-hr physical exercise protocol on the TVIS treadmill with vibration isolation (FE-5), ARED advanced resistive exercise device (CDR, FE-5, FE-6), and T2/COLBERT advanced treadmill (CDR, FE-6). [T2 snubber arm inspection is no longer needed after the last T2 session of the day but is now regularly being done once a week after the last T2 session.]

No CEO (Crew Earth Observation) photo targets uplinked for today.

ISS Orbit (as of this morning, 9:08am EDT [= epoch])
Mean altitude – 354.9 km
Apogee height – 359.6 km
Perigee height – 350.1 km
Period — 91.64 min.
Inclination (to Equator) — 51.64 deg
Eccentricity — 0.0007021
Solar Beta Angle — -47.9 deg (magnitude decreasing)
Orbits per 24-hr. day — 15.71
Mean altitude loss in the last 24 hours – 105 m
Revolutions since FGB/Zarya launch (Nov. 98) – 67,941.

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Three-crew operations————-
10/08/10 — Soyuz TMA-20/24S launch – Kelly (CDR-26)/Kaleri/Skripochka
10/10/10 — Soyuz TMA-20/24S docking
————–Six-crew operations————-
10/26/10 — Progress M-05M/37P undock
10/27/10 — Progress M-08M/40P launch
10/29/10 — Progress M-08M/40P docking
11/01/10 — STS-133/Discovery launch (ULF5 – ELC4, PMM) ~4:33pm EDT
11/12/10 — Russian EVA-26
11/17/10 — Russian EVA-27
11/30/10 — Soyuz TMA-19/23S undock/landing (End of Increment 25)
————–Three-crew operations————-
12/14/10 — Soyuz TMA-21/25S launch – Kondratyev (CDR-27)/Coleman/Nespoli
12/16/10 — Soyuz TMA-21/25S docking
————–Six-crew operations————-
12/20/10 — Progress M-07M/39P undock
01/24/10 — Progress M-08M/40P undock
01/28/10 — Progress M-09M/41P launch
01/31/10 — Progress M-09M/41P docking
02/xx/10 — Russian EVA-28
02/26/11 — STS-134/Endeavour (ULF6 – ELC3, AMS-02) ~4:19pm EDT“target”
03/16/11 — Soyuz TMA-20/24S undock/landing (End of Increment 26)
————–Three-crew operations————-
03/30/11 — Soyuz TMA-22/26S launch – A. Borisienko (CDR-28)/R.Garan/A.Samokutayev
04/01/11 — Soyuz TMA-22/26S docking
————–Six-crew operations————-
04/26/11 — Progress M-09M/41P undock
04/27/11 — Progress M-10M/42P launch
04/29/11 — Progress M-10M/42P docking
05/xx/10 — Russian EVA-29
05/16/11 — Soyuz TMA-21/25S undock/landing (End of Increment 27)
————–Three-crew operations————-
05/30/11 — Soyuz TMA-23/27S launch – M. Fossum (CDR-29)/S. Furukawa/S. Volkov
06/01/11 — Soyuz TMA-23/27S docking
————–Six-crew operations————-
06/21/11 — Progress M-11M/43P launch
06/23/11 — Progress M-11M/43P docking
08/29/11 — Progress M-11M/43P undocking
08/30/11 — Progress M-12M/44P launch
09/01/11 — Progress M-12M/44P docking
09/16/11 – Soyuz TMA-22/26S undock/landing (End of Increment 28)
————–Three-crew operations————-
09/30/11 — Soyuz TMA-24/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin
10/02/11 – Soyuz TMA-24/28S docking
————–Six-crew operations————-
10/20/11 — Progress M-10M/42P undocking
10/21/11 — Progress M-13M/45P launch
10/23/11 — Progress M-13M/45P docking
11/16/11 — Soyuz TMA-23/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — Soyuz TMA-25/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/02/11 — Soyuz TMA-25/29S docking
————–Six-crew operations—————-
12/??/11 — 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 — Progress M-13M/45P undock
03/14/12 — Soyuz TMA-24/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/26/12 — Soyuz TMA-26/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Valkov
03/28/12 — Soyuz TMA-26/30S docking
————–Six-crew operations—————-
05/15/12 — Soyuz TMA-25/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-27/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-27/31S docking
————–Six-crew operations—————-
09/09/12 — Soyuz TMA-26/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/23/12 — Soyuz TMA-28/32S launch – K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin
09/25/12 – Soyuz TMA-28/32S docking
————–Six-crew operations————-
10/07/12 — Soyuz TMA-27/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-29/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
11/xx/12 – Soyuz TMA-29/33S docking
————–Six-crew operations————-
03/xx/12 — Soyuz TMA-28/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/12 – Soyuz TMA-30/34S launch.
03/xx/12 – Soyuz TMA-30/34S docking
————–Six-crew operations————-

SpaceRef staff editor.