NASA ISS On-Orbit Status 26 October 2008

All ISS systems continue to function nominally, except those noted previously or below. Sunday – rest day for CDR Fincke, FE-1 Lonchakov, FE-2 Chamitoff. Ahead: Week 1 of Increment 18,– and Spanky & crew are off to a fine start.
CDR Fincke ended his FD15 (Flight Day 15) session with the NASA/JSC experiment NUTRITION w/Repository, his first, by collecting a final urine sample upon wakeup for storage in the MELFI (Minus-Eighty Laboratory Freezer for ISS), Dewar 1/Tray B.. The sampling kit was then stowed away. Mike’s next activity with this experiment will be the FD30 session. [The current NUTRITION project is the most comprehensive in-flight study done by NASA to date of human physiologic changes during long-duration space flight. It includes measures of bone metabolism, oxidative damage, nutritional assessments, and hormonal changes, expanding the previous Clinical Nutritional Assessment profile (MR016L) testing in three ways: Addition of in-flight blood & urine collection (made possible by MELFI), normative markers of nutritional assessment, and a return session plus 30-day (R+30) session to allow evaluation of post-flight nutrition and implications for rehabilitation.]
The new crew performed the regular weekly three-hour task of thorough station cleaning. ["Uborka", usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the FE’s sleep station with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]
As part of the house cleaning, Yuri conducted regular maintenance inspection & cleaning on fan screens in the FGB (TsV2), DC-1 (V3) and SM (VPkhO, VPrK, FS5, FS6 & FS9).
FE-1 Lonchakov also performed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM, including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. Additionally, the FE-1 today checked up on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]
The three station residents had their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Yuri at ~8:45am, Greg at ~10:05am, Mike at 1:30pm.
The crew executed their regular daily 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (FE-2), TVIS treadmill (CDR, FE-1), RED resistive exercise device (CDR, FE-1, FE-2) and VELO bike with bungee cord load trainer (FE-1). [Maximum speed for TVIS in motorized mode is not to exceed 16.1 km/h. SPDs (Subject Positioning Devices) are required for the first seven exercise sessions for the CDR and FE-1 for safety.]
CEO photography can be studied at this “Gateway” website:
http://eol.jsc.nasa.gov <http://eol.jsc.nasa.gov/> (as of 9/1/08, this database contained 770,668 views of the Earth from space, with 324,812 from the ISS alone).
Significant Events Ahead (all dates Eastern Time, some changes possible.):
10/26/08 – Daylight Saving Time ended in Europe & Russia
10/29/08 — Progress 30P reboost
11/02/08 — Daylight Saving Time (DST) ends
11/15/08 — STS-126/Endeavour/ULF2 launch – MPLM Leonardo, LMC
11/17/08 — STS-126/Endeavour/ULF2 docking
11/20/08 — ISS 10 Years
11/25/08 — Progress M-65/30P undocking & deorbit (UNDER REVIEW)
11/26/08 — Progress M-66/31P launch
11/30/08 — Progress M-66/31P docking
12/01/08 — STS-126/Endeavour/ULF2 landing (~1:25pm EST est.) (UNDER REVIEW)
02/09/09 — Progress M-66/31P undocking & deorbit
02/10/09 — Progress M-67/32P launch
02/12/09 — Progress M-67/32P docking
02/12/09 — STS-119/Discovery/15A launch – S6 truss segment
02/14/09 — STS-119/Discovery/15A docking
02/24/09 — STS-119/Discovery/15A undocking
02/26/09 — STS-119/Discovery/15A landing (nominal)
03/25/09 — Soyuz TMA-14/18S launch
03/27/09 — Soyuz TMA-14/18S docking (DC1)
04/05/09 — Soyuz TMA-13/17S undocking
04/07/09 — Progress M-67/32P undocking & deorbit
05/15/09 — STS-127/Endeavour/2J/A launch – JEM EF, ELM-ES, ICC-VLD
05/25/09 — Soyuz TMA-15/19S launch
05/27/09 — Six-person crew on ISS (following Soyuz 19S docking)
07/30/09 — STS-128/Atlantis/17A – MPLM(P), last crew rotation
10/15/09 — STS-129/Discovery/ULF3 – ELC1, ELC2
12/10/09 — STS-130/Endeavour/20A – Node-3 + Cupola
02/11/10 — STS-131/Atlantis/19A – MPLM(P)
04/08/10 — STS-132/Discovery/ULF4 – ICC-VLD, MRM1
05/31/10 — STS-133/Endeavour/ULF5 – ELC3, ELC4 (contingency).