NASA ISS On-Orbit Status 25 June 2013
International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/25/13 4:00 pm Central Daylight Time (CDT)
176/21:00 Greenwich Mean Time (GMT)
New Status: Crew Half Duty Day: The crew had a half day off today due to yesterday’s support of Russian EVA #33. Due to the long day yesterday, the crew was scheduled to wake up three and one-half hours later than normal and
USOS Extravehicular Activity (EVA)-22 Preparations: Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano, FE-6 Nyberg and CDR Vinogradov reviewed procedures for US EVA #22 scheduled for July 9th and US EVA #23 scheduled for July 16th. The review included detailed timelines and a briefing package. Following this activity they participated in a conference with ground teams. The crew also performed a Portable Onboard Computers (POC) Dynamic Onboard Ubiquitous Graphics (DOUG) software review.
Automated Transfer Vehicle (ATV)-4 Hatch Open and Cargo Operations: CDR Vinogradov performed a leak check, then he and FE-5 Parmitano re-opened the ATV hatch and re-connected the quick disconnect screw clamps. The hatch was closed on Sunday, June 23rd for Russian EVA #33. Following the hatch opening, Cassidy, Nyberg, and Parmitano completed this week’s ATV4 cargo operations completing 7 hours and 15 minutes of cargo operations in six crew hours and are approximately 51% complete with cargo operations.
Mobile Servicing System (MSS) Operations: Robotics Ground Controllers powered up the Mobile Servicing System (MSS) and maneuvered the Space Station Remote Manipulator System (SSRMS) to grapple the Special Purpose Dexterous Manipulator System (SPDM). They will next release the SPDM from Mobile Base System (MBS) Power Data Grapple Fixture (PDGF) 2 and maneuver SPDM Arm 2 to pick up the Robot Micro Conical Tool (RMCT) 2 from the SPDM Tool Holder Assembly (THA) with On-Orbit Replaceable Unit (ORU) Tool Changeout Mechanism (OTCM)-2. Finally the Robotics Ground Controllers will maneuver the SSRMS and SPDM into position for the start of the Secondary Power Distribution Assembly (SPDA) Door Checkout operations tomorrow.
Today’s Planned Tasks
– Reaction Self Test [Complete]
– Daily Planning Conference [Complete]
– On MCC Go ПрК-ATV Interface Leak Check ATV Systems [Complete]
– Removal of US TV cameras and Lights from Orlan Suits [Complete]
– EVA Procedures Print [Complete]
– WRS Water Sample Analysis [Complete]
– CIR – Hardware Setup [Complete]
– ISERV – Opening window shutters in the LAB [Complete]
– Orlan Feedwater Bladder Refill [Complete]
– On MCC Go ATV-СУ Hatch Opening [Complete]
– Drying Orlan-MK Water Feed Line [Complete]
– Installation of Quick Release Screw Clamps on SM Aft side [Complete]
– ARED Flywheel Cylinder Evacuation [Complete]
– ATV Deactivation after EVA [Complete]
– DOUG Software Review [Complete]
– Orlan-MK Drying [Complete]
– Post-EVA Pille Dosimeter Reading / r/g 2726 [Complete]
– Elektron-VM Liquid Unit Pressurization before Activation [Complete]
– EVA Procedure Review [Complete]
– Post-EVA Orlan Debrief With Specialists [Complete]
– Post-EVA Medical Kits Restow / r/g 2684 [Complete]
– Orlan-MK Drying. Switching to a backup fan [Complete]
– Elektron-VM Liquid Unit Pressurization before Activation [Complete]
– СОЖ Maintenance
– URISIS Hardware Setup
– EVA Procedure Conference [Complete]
– Orlan-MK Drying. End [Complete]
– Setting up Orlan and БСС for storage mode [Complete]
– TOCA 2 Data Recording [Complete]
– Exercise data downlink / r/g 2639
– Daily Planning Conference [Complete]
– Reaction Self Test
Task List
– CEO Ops
– WHC KTO replace
– WHC EDV R&R
– Roscosmos Report
– Uragan Photo
– Econ Photo
– EDV Separation
– VR Trainer Assemble [Complete]
– IFM – FFTD find [In work]
Ground
– Nominal Commanding
– Robotics commanding
Three-Day Look Ahead:
Wednesday, 6/26: Ocular Health activities, ATV cargo transfer, EVA tool stow
Thursday, 6/27: Ocular Health activities, ATV cargo transfer, Robonaut
Friday 6/28: Robonaut, Spinal Scan, ATV cargo transfer
QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Off
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Operate