Status Report

NASA ISS On-Orbit Status 25 December 2011

By SpaceRef Editor
December 24, 2011
Filed under , , ,
NASA ISS On-Orbit Status 25 December 2011

All ISS systems continue to function nominally, except those noted previously or below. Sunday C Crew off duty. Ahead: Week 6 of Increment 30 (six-person crew).

Merry Christmas to All!

After wakeup, Anatoly Ivanishin performed the routine inspection of the SM (Service Module) PSS Caution & Warning panel as part of regular Daily Morning Inspection.

CDR Burbank, FE-1 Shkaplerov, FE-2 Ivanishin, FE-4 Kononenko, FE-5 Kuipers & FE-6 Pettit joined in conducting the regular weekly three-hour task of thorough cleaning of their home, including COL (Columbus Orbital Laboratory) and Kibo JPM (JEM Pressurized Module). [“Uborka”, usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM (Service Module) dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of Uborka house cleaning, Anton, Anatoly & Oleg completed regular weekly maintenance inspection & cleaning of fan screens in the FGB (TsV2) plus Group E fan grilles in the SM (VPkhO, FS5, FS6, VP) and the BMP Harmful Contaminants Removal System grille in the SM. Before the cleaning, all fan screens were photographed for ground inspection.

Anton Shkaplerov conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM. This included the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow, as well as the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s & FGB’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for calldown. [SOZh servicing includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

Dan Burbank completed the regular (~weekly) inspection & maintenance, as required, of the CGBA-4 (Commercial Generic Bioprocessing Apparatus 4) and CGBA-5 payloads in their ERs (EXPRESS Racks) at Lab O2 & O1, focusing on cleaning the muffler air intakes. [Crewnote from Dan: “Both CGBAs nominal config with good temps and incrementing clocks.”]

In the COL, Kuipers serviced the ROALD-2 (Role of Apoptosis in Lymphocyte Depression 2) experiment. [FE-5 removed the two remaining ECs (Experiment Containers) from the KUBIK-3 thermostatically controlled container (+37 degC) and transferred them to MELFI-1 (-80 degC) to preserve the scientific samples. The dummy EC was installed in KUBIK-3 and the centrifuge restarted.]

Don Pettit & Andre Kuipers went on a search for a urine pH kit for the Pro K protocol which was delivered on Progress 45P and unloaded. The Teflon bag with the kit was to be stowed temporarily for Pro K. [Under the Pro K protocol, the crewmember measures and logs the pH value of a urine sample, to be collected the same time of day every day for 5 days. The crewmember also prepares a diet log and then annotates quantities of food packets consumed and supplements taken.]

Andre completed his daily task of filling out his SHD (Space Headache) questionnaire which he started after Soyuz launch and continues on ISS (on an SSC/Station Support Computer) for his first week in space. (Photos of the two questionnaires from his time on Soyuz were downlinked to the ground).

The CDR retrieved & stowed the four passive FMK (Formaldehyde Monitoring Kit) sampling assemblies, deployed on 12/23 in the Lab (at P3, below CEVIS) and SM (at the most forward handrail, on panel 307), to catch any atmospheric formaldehyde on a collector substrate for subsequent analysis on the ground. [Two monitors each are usually attached side by side, preferably in an orientation with their faces perpendicular to the direction of air flow.]

FE-5 & FE-6 had their (currently daily) post-arrival PMCs (Private Medical Conferences) via S- & Ku-band audio/video, Andre at ~12:30pm, Don at ~12:45pm EST.

CDR, FE-4, FE-5 & FE-6 conducted their Holiday PFCs (Private Family Conferences), via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Oleg at ~7:00am, Andre at ~8:50am, Dan at ~10:50am, Don at ~1:35pm.

The “old” crew worked out with their regular 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (CDR), TVIS treadmill with vibration isolation & stabilization (FE-1, FE-2), ARED advanced resistive exerciser (CDR), and VELO ergometer bike with load trainer (FE-1, FE-2).

Shkaplerov’s & Ivanishin’s Russian discretionary “time permitting” job today called for continued preparation & downlinking of more reportages (written text, photos, videos) for the Roskosmos website to promote Russia’s manned space program (max. file size 500 Mb).

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 8:03am EST [= epoch])
Mean altitude C 391.7 km
Apogee height C 408.2 km
Perigee height C 375.2 km
Period — 92.39 min.
Inclination (to Equator) — 51.64 deg
Eccentricity — 0.0024368
Solar Beta Angle — 9.6 deg (magnitude increasing)
Orbits per 24-hr. day — 15.58
Mean altitude loss in the last 24 hours — 112 m
Revolutions since FGB/Zarya launch (Nov. 98) — 75,077
Time in orbit (station) — 4783 days
Time in orbit (crews, cum.) — 4070 days

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Six-crew operations—————-
01/18/12 — ISS Reboost (set up phasing for 46P)
01/24/12 — Progress M-13M/45P undock
01/25/12 — Progress M-14M/46P launch
01/27/12 — Progress M-14M/46P docking (DC-1)
02/07/12 — SpaceX Falcon 9/Dragon launch — (target date)
02/10/12 — SpaceX Falcon 9/Dragon berthing — (target date)
02/14/12 — Russian EVA
02/23/12 — SpaceX Falcon 9/Dragon unberth — (target date)
03/09/12 — ATV3 launch — (target date)
03/16/12– Soyuz TMA-22/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/30/12 — Soyuz TMA-04M/30S launch C G.Padalka (CDR-32)/J.Acaba/K.Volkov — (Target Date)
04/01/12 — Soyuz TMA-04M/30S docking (MRM2) — (Target Date)
————–Six-crew operations—————-
TBD — 3R Multipurpose Laboratory Module (MLM) w/ERA C launch on Proton (under review)
04/24/12 — Progress M-14M/46P undock
04/25/12 — Progress M-15M/47P launch
04/27/12 — Progress M-15M/47P docking
TBD — 3R Multipurpose Laboratory Module (MLM) C docking (under review)
05/16/12 — Soyuz TMA-03M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/30/12 — Soyuz TMA-05M/31S launch C S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
06/01/12 — Soyuz TMA-05M/31S docking
————–Six-crew operations—————-
06/26/12 — HTV-3 launch (target date)
09/12/12 — Soyuz TMA-04M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/26/12 — Soyuz TMA-06M/32S launch C K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
09/28/12 C Soyuz TMA-06M/32S docking
————–Six-crew operations————-
11/12/12 — Soyuz TMA-05M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/26/12 — Soyuz TMA-07M/33S launch C C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
11/28/12 C Soyuz TMA-07M/33S docking
————–Six-crew operations————-
03/19/13 — Soyuz TMA-06M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
04/02/13 C Soyuz TMA-08M/34S launch C P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
04/04/13 C Soyuz TMA-08M/34S docking
————–Six-crew operations————-
05/16/13 C Soyuz TMA-07M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/29/13 C Soyuz TMA-09M/35S launch C M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/31/13 C Soyuz TMA-09M/35S docking
————–Six-crew operations————-
09/xx/13 C Soyuz TMA-08M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 C Soyuz TMA-10M/36S launch C M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 C Soyuz TMA-10M/36S docking
————–Six-crew operations————-
11/xx/13 C Soyuz TMA-09M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 C Soyuz TMA-11M/37S launch C K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 C Soyuz TMA-11M/37S docking
————–Six-crew operations————-
03/xx/14 C Soyuz TMA-10M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-

SpaceRef staff editor.