NASA ISS On-Orbit Status 23 October 2011

By SpaceRef Editor
October 23, 2011
Filed under , , ,
NASA ISS On-Orbit Status 23 October 2011
http://images.spaceref.com/news/2011/iss.103.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew off duty. Ahead: Week 6 of Increment 29 (three-person crew).

FE-4 Volkov performed the routine checkup of the SM (Service Module) PSS Caution & Warning panel as part of regular Daily Morning Inspection.

At wake-up, CDR Mike Fossum & FE-5 Satoshi Furukawa completed another post-sleep session of the Reaction Self Test (Psychomotor Vigilance Self Test on the ISS) protocol. [RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

Sergey tended the current experiment with the Russian/German KPT-21 Plasma Crystal-3+ (Plazmennyi-Kristall/PK-3+) payload, running in the MRM2 “Poisk” module, by checking the hermeticity of the evacuated EB vacuum chamber after wakeup and before bedtime (any pressure increase above the vacuum should stay within 5 mmHg). [Main objective of PK-3 is to study wave propagation and dispersion ratio in a dust plasma, i.e., fine particles charged and excited by HF (high frequency) radio power inside the evacuated work chamber, at a specified power of HF discharge, pressure, and a varied number of particles.]

Later, FE-4 conducted the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM. This included the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow, as well as the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s & FGB’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for calldown. [SOZh servicing includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

The Russian flight engineer also completed the daily inspection of the running Russian BIO-5 Rasteniya-2 (“Plants-2”) payload with its LADA-01 greenhouse, verifying proper watering of the KM A32 & A24 root modules. [Rasteniya-2 researches growth and development of plants (currently wheat) under spaceflight conditions in the LADA greenhouse from IBMP (Institute of Bio-Medical Problems, Russian: IMBP).]

CDR & FE-5 had their weekly PFCs (Private Family Conferences) on today’s schedule, via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Mike at ~2:40pm, Satoshi at ~4:30pm EDT.

The crew worked out with their regular 2-hr physical exercise protocol on the CEVIS cycle ergometer with vibration isolation (FE-5), TVIS treadmill with vibration isolation & stabilization (FE-4), ARED advanced resistive exercise device (CDR, FE-4, FE-5), and T2/COLBERT advanced treadmill (CDR).

Tasks listed for Sergey Volkov on the Russian discretionary “time permitting” job for today were –

* Continuing the preparation & downlinking of more reportages (written text, photos, videos) for the Roskosmos website to promote Russia’s manned space program (max. file size 500 Mb),

* Another ~30-min. run of the GFI-8 “Uragan” (hurricane) earth-imaging program with the NIKON D3X digital camera with Sigma AF 300-800mm telelens, aiming for the Himalayas, volcano Cordon-Kaul in Chile/South America, volcano Hierro on the island of El Hierro (smallest and most westerly island of the Canary Islands), and

* Another ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop.

Conjunction 2 Update: The conjunction with Object #30917 (Fengyun 1C debris) at 8:26am EDT this morning stayed outside the area of concern and required no action.

CSL SSC Troubleshooting: After the crew yesterday worked the discretionary task list item of recovering the hard drives of CSL (Crew Support LAN) laptops, ground specialists got varying results on “pinging” SSC-13 (no response), SSC-17 (good response), SSC-21 (good response). Using the new SWRDFSH (Swordfish) software update, SSC-17 remained unresponsive while SSC-21 reported good connection (except for the Ultrabay drive transferred from the original failed SSC-20).

No CEO (Crew Earth Observation) targets uplinked for today.

ISS Orbit (as of this morning, 8:46am EDT [= epoch])
* Mean altitude – 387.5 km
* Apogee height – 399.6 km
* Perigee height – 375.4 km
* Period — 92.30 min.
* Inclination (to Equator) — 51.64 deg
* Eccentricity — 0.0017817
* Solar Beta Angle — 15.4 deg (magnitude decreasing)
* Orbits per 24-hr. day — 15.60
* Mean altitude loss in the last 24 hours — 130 m
* Revolutions since FGB/Zarya launch (Nov. 98) — 74,094
* Time in orbit (station) — 4720 days
* Time in orbit (crews, cum.) — 4007 days

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Three-crew operations (Increment 29)————-
10/29/11 — Progress M-10M/42P undocking (5:01am EDT)
10/30/11 — Progress M-13M/45P launch (6:11am)
11/02/11 — Progress M-13M/45P docking (~7:42am)
11/13/11 — Soyuz TMA-03M/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin (11:14pm)
11/16/11 — Soyuz TMA-03M/28S docking (MRM2) (~12:45am)
————–Six-crew operations————-
11/22/11 — Soyuz TMA-02M/27S undock/landing (End of Increment 29) (~9:21pm)
————–Three-crew operations————-
11/30/11 — SpaceX Falcon 9/Dragon — Target date
12/26/11 — Soyuz TMA-04M/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit — (date “on or about”)
12/28/11 — Soyuz TMA-04M/29S docking (MRM1) — (date “on or about”)
————–Six-crew operations—————-
TBD — Progress M-13M/45P undock
TBD — Progress M-14M/46P launch
TBD — Progress M-14M/46P docking (DC-1)
02/29/12 — ATV3 launch readiness
TBD — Soyuz TMA-03M/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/xx/12 — Soyuz TMA-05M/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Volkov
04/xx/12 — Soyuz TMA-05M/30S docking (MRM2)
————–Six-crew operations—————-
05/05/12 — 3R Multipurpose Laboratory Module (MLM) w/ERA – launch on Proton (under review)
05/06/12 — Progress M-14M/46P undock
05/07/12 — 3R Multipurpose Laboratory Module (MLM) – docking (under review)
05/xx/12 — Soyuz TMA-04M/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/xx/12 – Soyuz TMA-06M/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/xx/12 – Soyuz TMA-06M/31S docking
————–Six-crew operations—————-
09/xx/12 — Soyuz TMA-05M/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
10/xx/12 — Soyuz TMA-07M/32S launch – K.Ford (CDR-34)/O.Novitskiy/E.Tarelkin
10/xx/12 – Soyuz TMA-07M/32S docking
————–Six-crew operations————-
11/xx/12 — Soyuz TMA-06M/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-08M/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
12/xx/12 – Soyuz TMA-08M/33S docking
————–Six-crew operations————-
03/xx/13 — Soyuz TMA-07M/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/13 – Soyuz TMA-09M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/xx/13 – Soyuz TMA-09M/34S docking
————–Six-crew operations————-
05/xx/13 – Soyuz TMA-08M/33S undock/landing (End of Increment 35)
————–Three-crew operations————-
05/xx/13 – Soyuz TMA-10M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/xx/13 – Soyuz TMA-10M/35S docking
————–Six-crew operations————-
09/xx/13 – Soyuz TMA-09M/34S undock/landing (End of Increment 36)
————–Three-crew operations————-
09/xx/13 – Soyuz TMA-11M/36S launch – M.Hopkins/TBD (CDR-38)/TBD
09/xx/13 – Soyuz TMA-11M/36S docking
————–Six-crew operations————-
11/xx/13 – Soyuz TMA-10M/35S undock/landing (End of Increment 37)
————–Three-crew operations————-
11/xx/13 – Soyuz TMA-12M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/TBD
11/xx/13 – Soyuz TMA-12M/37S docking
————–Six-crew operations————-
03/xx/14 – Soyuz TMA-11M/36S undock/landing (End of Increment 38)
————–Three-crew operations————-