All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew rest day.

After wakeup, FE-1 Novitskiy performed the routine inspection of the SM PSS Caution & Warning panel as part of regular Daily Morning Inspection. Oleg also completed the periodic (daily) reboot of the Russian RS1 & RS2 laptops.

After wakeup, FE-2 Tarelkin rebooted the Russian RSS1 & RSS2 laptops and completed daily routine maintenance on the BRI smart switch router (SSR), checking its temperature via DeviceControl on the RSS1 laptop to ensure nominal operation. [The BRI fan module consists of 4 individual fans. If one or several of these exhibit malfunction or rotation speed decreases, a combined warning is sent to the DeviceControl application on the RSS1 laptop to generate an emergency message and telemetry signal, “BRI1”. The fan module is an ORU (On-orbit Replaceable Unit).]

CDR Ford closed the protective shutters of the US Lab, Node-3/Cupola and JAXA JPM (JEM Pressurized Module) windows for the upcoming ISS reboost.

Kevin performed the regular (~weekly) inspection & maintenance, as required, of the CGBA-4 (Commercial Generic Bioprocessing Apparatus 4) and CGBA-5 payloads in their ERs (EXPRESS Racks) at Lab O2 & O1, focusing on cleaning the muffler air intakes.

Oleg activated the Russian payload TEKh-39 LCS (Laser Communications System, Russian: SLS) in the SM. About 6hr later, FE-1 copied the collected test data from the RSE-SLS A31p laptop to the RSS2 laptop for data downlink and log file dump.

Working as a team, the crewmembers, now grown to six again, conducted the regular weekly three-hour task of thorough cleaning of their home, including all USOS (US Orbit Segment) modules like Lab, Nodes, COL (Columbus Orbital Laboratory) and Kibo JPM. [“Uborka”, usually done on Saturdays, includes removal of food waste products, cleaning of compartments with vacuum cleaner, damp cleaning of the SM dining table, other frequently touched surfaces and surfaces where trash is collected, as well as the sleep stations with a standard cleaning solution; also, fan screens and grilles are cleaned to avoid temperature rises. Special cleaning is also done every 90 days on the HEPA (high-efficiency particulate air) bacteria filters in the Lab.]

As part of Uborka house cleaning, Oleg & Evgeny conducted regular weekly maintenance inspection & cleaning of fan screens in the FGB (TsV2) plus Group E fan grilles in the SM (VPkhO, FS5, FS6, VP), the SKV air conditioner in the SM and the periodic cleaning of Russian Potok-150 (150 micron) pre-filters of the SM’s & FGB’s SOGS air purification subsystem.

FE-5 Hadfield & FE-6 Marshburn started the day with their first post-sleep sessions of the Reaction Self-Test (Psychomotor Vigilance Self-Test on the ISS) protocol. [RST is done twice daily (after wakeup & before bedtime) for 3 days prior to the sleep shift, the day(s) of the sleep shift and 5 days following a sleep shift. The experiment consists of a 5-minute reaction time task that allows crewmembers to monitor the daily effects of fatigue on performance while on ISS. The experiment provides objective feedback on neurobehavioral changes in attention, psychomotor speed, state stability, and impulsivity while on ISS missions, particularly as they relate to changes in circadian rhythms, sleep restrictions, and extended work shifts.]

Chris & Tom performed their currently daily filling out the SHD (Space Headache) questionnaire which they started after their Soyuz launch on a daily basis and continue on ISS (on an SSC/Station Support Computer) for every week after their first week in space.

Hadfield & Marshburn had their 2nd post-arrival PMCs (Private Medical Conferences), via S- & Ku-band audio/video, Chris at ~9:50am, Tom at ~10:05am EST.

Tom, Roman, and Oleg were scheduled for their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Oleg at ~6:15am, Roman at ~7:35am, Tom at ~2:20pm EST.

At ~8:15am EST, the three crewmembers held the standard WPC (Weekly Planning Conference) with the ground, discussing next week’s “Look-Ahead Plan” (prepared jointly by MCC-H and TsUP-Moscow timeline planners), via S-band/audio, reviewing upcoming activities and any concerns about future on-orbit events.

At ~11:20am, the Russian crewmembers Oleg, Evgeny & Roman supported a Russian PAO TV downlink for Roskosmos TV Studio’s joint project with News Channel “Russia 24”, producing its weekly program on cosmonautics.

ISS Reboost Report: This morning (12/23), at ~6:28am EST, ISS performed a 4 min 4.8sec single-burn reboost maneuver using Progress 49P, docked at the SM Aft port, for orbital phasing and Progress 50P launch on 2/12.

Significant Events Ahead (all dates Eastern Time and subject to change):
————– Inc-34: Six-crew operations ————-
02/11/13 — Progress M-16M/48P undocking
02/12/13 — Progress M-18M/50P launch
02/14/13 — Progress M-18M/50P docking
03/15/13 — Soyuz TMA-06M/32S undock/landing (End of Increment 34)
————– Inc-35: Three-crew operations ————-
03/28/13 — Soyuz TMA-08M/34S launch – P.Vinogradov (CDR-36)/C.Cassidy/A.Misurkin
03/30/13 — Soyuz TMA-08M/34S docking
04/15/13 – Progress N-17M/49P undock
04/18/13 — ATV4 launch
04/23/13 — Progress M-18M/50P undock
04/24/13 – Progress M-19M/51P launch
04/26/13 – Progress M-19M/51P docking
05/01/13 — ATV4 docking
————– Inc-35: Six-crew operations ————-
05/14/13 — Soyuz TMA-07M/33S undock/landing (End of Increment 35)
————– Inc-36: Three-crew operations ————-
05/28/13 — Soyuz TMA-09M/35S launch – M.Suraev (CDR-37)/K.Nyberg/L.Parmitano
05/30/13 — Soyuz TMA-09M/35S docking
————– Inc-36: Six-crew operations ————-
07/23/13 – Progress M-19M/51P undock
07/24/13 – Progress M-20M/52P launch
07/26/13 — Progress M-20M/52P docking
09/11/13 — Soyuz TMA-08M/34S undock/landing (End of Increment 36)
————– Inc-37: Three-crew operations ————-
09/25/13 — Soyuz TMA-10M/36S launch – M.Hopkins/O.Kotov(CDR-38)/S.Ryanzansky
09/27/13 — Soyuz TMA-10M/36S docking
————– Inc-37: Six-crew operations ————-
11/xx/13 — Soyuz TMA-09M/35S undock/landing (End of Increment 37)
————– Inc-38: Three-crew operations ————-
11/xx/13 — Soyuz TMA-11M/37S launch – K.Wakata (CDR-39)/R.Mastracchio/M.Tyurin
11/xx/13 — Soyuz TMA-11M/37S docking
12/18/13 — Progress M-20M/52P undock
————– Inc-38: Six-crew operations ————-
03/xx/14 — Soyuz TMA-10M/36S undock/landing (End of Increment 38)
————– Inc-39: Three-crew operations ————-