International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/21/13 4:00 pm Central Daylight Time (CDT)
172/21:00 Greenwich Mean Time (GMT)

New Status: Crew Medical Officer (CMO) On-Board Training (OBT): Flight Engineer (FE)-3 Cassidy, FE-5 Parmitano and FE-6 Nyberg completed their CMO OBT. This is a Computer Based Training (CBT) module that requires no ground interaction and is performed periodically to maintain proficiency for designated onboard CMOs.

Binary Colloidal Alloy Test (BCAT)-C1 Experiment Pre-Mix: Cassidy pre-mixed samples inside the slow growth sample module. This allows the colloidal material to be freed from inside the cap area of the cuvette which will improve the quality of the science when sample processing begins at a later time.

Temperature and Humidity Control (THC) Common Cabin Air Assembly (CCAA) Swap: Cassidy deactivated the LAB1S6 CCAA and terminated the Low Temperature Loop (LTL) flow through its heat exchanger. He then activated the LAB1P6 CCAA and initiated LTL flow through its heat exchanger. This activity is for condensate collection and to prevent overloading any one system.

DEvice for the study of Critical LIquids and Crystallization (DECLIC): Nyberg removed and replaced the hard drive, then she removed the Alice-Like Insert (ALI) from the DECLIC experiment locker and installed the High Temperature Insert (HTI) in the locker. This activity is in preparation for the first session planned for July. The investigation is important for the development of cooling systems for use in space as well as systems which may be useful in waste disposal and recycling on Earth.

Periodic Health Status (PHS) Evaluation Without Blood: Parmitano conducted a periodic health status check without blood draws with assistance from Cassidy as CMO. This test is a routine heath status check crewmembers conduct while on orbit.

Optical Coherence Tomography (OCT): Nyberg unstowed, inspected and performed initial checkout of the new OCT hardware which uses reflected light to produce detailed cross-sectional and three-dimensional images of structures of the eye. It complements other hardware used on orbit to study the visual impairment and intracranial pressure risk faced by crewmembers on long-duration flights.

Biological Rhythms 48 Holter Data Save: Parmitano removed the Digital Walk Holter ECG and Actiwatch Spectrum from his body following 48 hours of wearing the devices. He transferred the data for downlink to the ground. The investigation examines the circadian variations in the cardiac autonomic function during space flight. Results will be used to improve crew health technology on long-duration space flights.

Today’s Planned Tasks
– PRO K Urine PH Test [Complete]
– REACTION – Self-reaction test [Complete]
– HRF Urine Sample Collection [Complete]
– HRF – Sample Insertion into MELFI [Complete]
– HRF Blood Draw [Complete]
– Reaction Self Test [Complete]
– HRF Refrigerated Centrifuge Configuration [Complete]
– Daily Planning Conference (S-band) [Complete]
– ISS Crew and ГОГУ conference [Complete]
– HRF – Closeout Ops [Complete]
– HRF – Sample Insertion into MELFI [Complete]
– Regeneration of БМП Ф2 Micropurification Cartridge (start) [Complete]
– Microbial Sample Collection / r/g 2641 [Complete]
– СОЖ Maintenance [Complete]
– Comm Config for EVA training / EVA from DC, Orlan-MK [Complete]
– DC1 Air Duct Removal (without removal of B3 fan ) / EVA from DC, [Complete]
– Remove depress hose for UPA operations [Complete]
– PHS Evaluation Setup [Complete]
– Periodic Health Status – Assistance [Complete]
– Orlan Systems Checkout during pre-EVA training [Complete]
– Periodic Health Status – Subject [Complete]
– Periodic Health Status (PHS) Data Entry and Stowage of All Hardware Used in PHS [Complete]
– DC1 БСС (Orlan Interface Unit) Checkout [Complete]
– Temperature and Humidity Control (THC) CCAA swap from S6 to P6 [Complete]
– EVA Gear Donning r/g 2599 [Complete]
– Suited Exercise Dry Run – Assistance in suited Exercise [Complete]
– Comm check and medical parameter test [Complete]
– BCAT-C1 Samples Premix Group A (samples 2-3-4) [Complete]
– Orlan and БСС Initial Conditions Check In Run / EVA from DC, [Complete]
– Entry into Orlan, Seal off Backpacks / EVA from DC, Orlan-MK, [Complete]
– EVA process print [Complete]
– EVA IR Camera Setup for OCT [Complete]
– Orlan and БСС Controls Checkout / EVA from DC, [Complete]
– Orlan and БСС Preliminary Leak Check / EVA from DC, [Complete]
– Orlan fit check at suit pressure Р.СК= 0.4 / EVA from DC, Orlan-MK, [Complete]
– Orlan translation training / EVA from DC, Orlan-MK Ops, r/g 2694, 2695 [Complete]
– ТК 708 comm check in preparation for EVA-33 [Complete]
– Exit from Orlan / EVA from DC, Orlan-MK, [Complete]
– Post-Suited Exercise Comm Reconfig For Nominal Ops / EVA from DC, [Complete]
– Testing of constant audio/video stream to the ground to try and isolate audio dropout cause [Complete]
– PROK. Diet logging [Complete]
– PROK – Diet and Log Sheet Photos [Complete]
– Inspection and Photography of SM windows r/g 2699 [Complete]
– Optical Coherence Tomography (OCT) Hardware Checkout (Part 1) [Complete]
– ARED Cylinder Flywheel Evacuation [Complete]
– Post-exercise closeout ops, air duct installation / EVA from DC1 [Complete]
– SHD – Weekly Questionnaire [Complete]
– P/TV encoder audio test [Complete]
– Crew Medical Officer (CMO) Proficiency Training [Complete]
– Assemble additional ЕДВ-У for WHC [Complete]
– Set up a G1 camcorder to the A/L SSC 10 for US EVA [Complete]
– Installation of Orlan spacesuit replaceable elements for EVA r/g 2599 [Complete]
– Time to ensure SSC21 will support EVA review requirements during isolated Soyuz Ops [Complete]
– BLR48. Data Saving [Complete]
– Crew Medical Officer (CMO) Proficiency Training [Complete]
– Conclusion of the constant audio/video test to the ground [Complete]
– БК-3М Unit Replacement / Orlan-MK Ops, r/g 2563 [Complete]
– BLR48. Saving data on Laptop [Complete]
– DC1 БК-3 Oxygen Tank Pressure Check / EVA from DC, [Complete]
– Optical Coherence Tomography (OCT) Hardware Checkout (Part 2) [Complete]
– ПхО БК-3 Oxygen Tank Pressure Check / EVA from DC, [Complete]
– EVA process print [Complete]
– IMS Update [Complete]
– Optical Coherence Tomography (OCT) Hardware Deactivation and Stowage [Complete]
– Daily Planning Conference (S-band) [Complete]
– Flight Director/ISS Crew Tagup [Complete]
– Thermolab – Instrumentation Ops for Circadian Rhythms [Complete]
– БМП Ф2 Absorption Cartridge Regeneration (termination) [Complete]
– REACTION – Self-reaction test [Complete]

Task List
– CEO ops
– WHC KTO replace
– WHC EDV R&R
– Preparation of reports for Roskosmos site
– ECON-M. Observations and Photography
– URAGAN Observations and Photography
– EVA-GTEC assembly [Complete]
– Laptop transfer [Complete]
– PMM followup [Complete]
– RFID find/checkout [Complete]

Ground
– Nominal Commanding

Three-Day Look Ahead:
Saturday, 6/22: Crew off duty
Sunday, 6/23: Crew off duty
Monday, 6/24: RS EVA #33

QUICK ISS Status – Environmental Control Group:
Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Operate
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up