Status Report

NASA ISS On-Orbit Status 20 January 2008

By SpaceRef Editor
January 20, 2008
Filed under , , ,
NASA ISS On-Orbit Status 20 January 2008
http://images.spaceref.com/news/exp.16.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday — off-duty day for CDR Whitson, FE-1 Malenchenko and FE-2 Tani. Ahead: Week 14 of Increment 16.

For today’s VolSci (Voluntary Weekend Science) program, CDR Whitson continued her work with the MSG (Microgravity Science Glovebox) and the InSPACE-2 (Investigating the Structure of Paramagnetic Aggregates from Colloidal Emulsions) experiment, today conducting runs #18, #19, and #20, then powered down the payload and switched the MSG to standby. [After activation of MSG plus InSPACE & InSPACE-2 equipment, Peggy checked on alignment & focusing of MSG video cams, switched the magnetic field between runs, today pulsing the field at 2 Hz (Hertz) instead of 20 Hz as she did previously. Peggy also repositioned the sample vial (VA-004) by 90 deg, used camera 2 & recorder 2 in the vial position 2 starting with run #19, changed out video recorder tapes and later deactivated InSPACE & MSG. InSPACE, conducted last in June 2006 by Jeff Williams on Increment 13, obtains basic data on magnetorheological fluids, i.e., a new class of "smart materials" that can be used to improve or develop new brake systems, seat suspensions robotics, clutches, airplane landing gear, and vibration damper systems. The dispersed particles are contained in CAs (Coil Assemblies) in the MSG that subject them to electric fields of certain strength and frequencies.]

FE-2 Dan Tani completed his daily status check on the BCAT-3 (Binary Colloidal Alloy Test-3) science payload, running by itself in Node-2 since 12/13/07 (briefly interrupted for EVA-13 photo support). [The status check, conducted on the last image taken by the DCS 760 digital still camera which is controlled by EarthKAM software on an A31p laptop, is to verify proper image focus and camera alignment. The SSC (Station Support Computer) is taking photography of the phase separation occurring in the BCAT Sample 3, with the photo flash going off every half hour.]

FE-1 Malenchenko conducted today’s routine maintenance of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including ASU toilet facilities systems/replaceables, the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP.

The crewmembers performed their regular 2.5-hr physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the CEVIS cycle ergometer (CDR), TVIS treadmill (FE-1, FE-2), RED (CDR, FE-2) and VELO bike with bungee cord load trainer (FE-1).

At ~9:30am EST, Yuri had his PFC (Private Family Conference) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on the SSC-10 laptop).

At ~2:22pm, Dan had his PFC.

With the Elektron-VM O2 (oxygen) generator currently off, a 5-min cabin air refresh is to be performed by the FE-1 (off his voluntary task list) from Progress M-62/27P storage (SrPK) as required.

MPC HDTV Update: Dan Tani was lauded by the ground for his great work on 1/17 verifying the MPC HDTV (Multi-Purpose Converter/High-Definition TV) capability all the way to the NASA TV satellite. The test was very successful, yielding an overall end-to-end audio latency (delay) for the MPC System of 3.2 seconds. This is the delay from the crewmember to JSC/MCC-H to NASA Headquarters and out to the NASA TV satellite in high definition, i.e. the sum total of the audio delay the interviewer and interviewee will "feel" during an interactive event. This Japan/JAXA originated system will be utilized soon for downlink messages and in-flight interviews based on client capability.

No CEO photo targets uplinked for today. [Due to the Martin Luther King Federal Holiday tomorrow (1/21), the next CEO observations will be conducted on 1/23 (targets uplinked 1/22).]

CEO photography can be viewed and studied at the websites:
http://eol.jsc.nasa.gov (about 700,000 NASA digital photographs of Earth are downloaded by the public each month from this “Gateway” site);
http://earthobservatory.nasa.gov/
http://earthobservatory.nasa.gov/Study/AstronautPhotography

ISS Orbit (as of this morning, 8:37am EST [= epoch]):
Mean altitude — 338.1 km
Apogee height — 341.8 km
Perigee height — 334.5 km
Period — 91.30 min.
Inclination (to Equator) — 51.64 deg
Eccentricity — 0.0005434
Solar Beta Angle — 23.8 deg (magnitude increasing)
Orbits per 24-hr. day — 15.77
Mean altitude loss in the last 24 hours — 132 m
Revolutions since FGB/Zarya launch (Nov. 98) — 52507

Significant Events Ahead (all dates Eastern Standard, some changes possible. NET = Not Earlier Than):
01/30/08 — EVA-14 (BMRRM R&R)
01/31/08 — Explorer-1 50 Years (1st U.S. Satellite on Redstone rocket) [see http://usspace50.com ]
02/04/08 — Progress M-62/27P undocking (5:30am) & reentry
02/05/08 — Progress M-63/28P launch (8:03am)
02/07/08 — Progress M-63/28P docking (9:33am)
02/07/08(target date) — STS-122/Atlantis/1E launch — Columbus Module, ICC-Lite.02/09/08 — Progress M-
02/22/08(NET) — ATV-1 “Jules Verne” launch/Ariane V (Kourou, French Guyana)
03/06/08 — ATV-1 Demo Day 1
03/12/08 — ATV-1 Demo Day 2
03/13/08(target date) — STS-123/Endeavour/1J/A launch/1J/A, w/SLP-SPDM, JEM ELM-PS
03/15/08 — ATV-1 Demo Day 3 & Docking (SM aft port)
04/07/08 — Progress M-63/28P undocking (DC1) & reentry
04/08/08 — Soyuz TMA-12/16S launch
04/10/08 — Soyuz TMA-12/16S docking (DC1)
04/19/08 — Soyuz TMA-11/15S undocking (FGB nadir port)
04/23/08 — Soyuz TMA-12/16S relocation (from DC1 to FGB nadir port)
04/24/08 — STS-124/Discovery/1J launch – JEM PM “Kibo”, racks, RMS
04/26/08 — STS-124/Discovery/1J docking
05/04/08 — STS-124/Discovery/1J undocking
05/14/08 — Progress M-64/29P launch
05/16/08 — Progress M-64/29P docking (DC1)
08/07/08(NET) — ATV-1 undocking (from SM aft port)
08/12/08 — Progress M-65/30P launch
08/14/08 — Progress M-65/30P docking (SM aft port)
09/09/08 — Progress M-64/29P undocking (from DC1)
09/10/08 — Progress M-66/31P launch
09/12/08 — Progress M-66/31P docking (DC1)
09/18/08 — STS-126/Discovery/ULF2 launch – MPLM Leonardo, LMC
09/20/08 — STS-126/Discovery/ULF2 docking
10/01/08 — STS-126/Discovery/ULF2 undocking.
10/01/08 — NASA 50 Years
10/11/08 — Progress M-65/30P undocking (from SM aft port)
10/12/08 — Soyuz TMA-13/17S launch
10/14/08 — Soyuz TMA-13/17S docking (SM aft port)
10/23/08 — Soyuz TMA-12/16S undocking (FGB nadir)
11/03/08 — Soyuz TMA-13/17S relocation (from SM aft to FGB nadir)
11/06/08 — STS-119/Discovery/15A launch – S6 truss segment
11/08/08 — STS-119/Discovery/15A docking
11/17/08 — STS-119/Discovery/15A undocking
11/20/08 — ISS 10 Years
11/26/08 — Progress M-67/32P launch
11/28/08 — Progress M-67/32P docking (SM aft port)
04/15/09 — Constellation’s Ares I-X Launch
05/??/09 — Six-person crew on ISS (following Soyuz 18S-2 docking)
04/??/10 — STS-132/Discovery/20A – Node-3 + Cupola.

SpaceRef staff editor.