Status Report

NASA ISS On-Orbit Status 2 November 2008

By SpaceRef Editor
November 3, 2008
Filed under , , ,
NASA ISS On-Orbit Status 2 November 2008
http://images.spaceref.com/news/iss.56.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – rest day for CDR Fincke, FE-1 Lonchakov, FE-2 Chamitoff. Ahead: Week 2 of Increment 18. We are now on Standard Time again.

FE-1 Lonchakov performed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the Service Module (SM), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. Additionally, the FE-1 today checked up on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP-Moscow. [Regular daily SOZh maintenance consists, among else, of checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers.]

FE-2 Chamitoff performed the standard sensor calibration on the CSA-O2 (Compound Specific Analyzer-Oxygen) units #1043 & #1059, delivered on 1J, using a new calibration adapter (#1001), brought up by 30P.

Working on the MATRYOSHKA-R (RBO-3-2) radiation instrumentation in the SM (panel 326), Lonchakov turned off the AST Spectrometer, taking radiation measurements since 10/17, then removed the PCMCIA (Portable Computer Memory Card International Adapter) ALC-954 memory card and checked number and size of its data files. Card 954 was then stowed in a kit, with the AST Spectrometer remaining deactivated.

The CDR & FE-1 had their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Yuri at ~9:30am EST, Mike at ~3:40pm.

Working from the US voluntary “job jar” task list, Mike & Greg completed “deep sleep” recovery of the IWIS RSU (Internal Wireless Integrated System/Remote Sensor Unit) system. [IWIS RSUs collect structural dynamics data on the ISS structure during specific “disturbance” events such as thruster firings, docking/undocking, etc.]

The crew executed their regular daily 2.5-hr. physical workout program (about half of which is used for setup & post-exercise personal hygiene) on the TVIS treadmill (CDR, FE-1, FE-2), RED resistive exercise device (CDR, FE-1, FE-2) and VELO bike with bungee cord load trainer (FE-1).

No CEO (Crew Earth Observation) targets uplinked today.

CEO photography can be studied at this “Gateway” website:
http://eol.jsc.nasa.gov (as of 9/1/08, this database contained 770,668 views of the Earth from space, with 324,812 from the ISS alone).

Significant Events Ahead (all dates Eastern Time, some changes possible.):
11/14/08 — STS-126/Endeavour/ULF2 launch – MPLM Leonardo, LMC; 7:55pm;
11/16/08 — STS-126/Endeavour/ULF2 docking
11/20/08 — ISS 10 Years
11/25/08 — Progress M-65/30P undocking & deorbit
11/26/08 — Progress M-66/31P launch
11/29/08 — STS-126/Endeavour/ULF2 landing (~2:00 pm EST est.)
11/30/08 — Progress M-66/31P docking
02/09/09 — Progress M-66/31P undocking & deorbit
02/10/09 — Progress M-67/32P launch
02/12/09 — Progress M-67/32P docking
02/12/09 — STS-119/Discovery/15A launch – S6 truss segment
02/14/09 — STS-119/Discovery/15A docking
02/24/09 — STS-119/Discovery/15A undocking
02/26/09 — STS-119/Discovery/15A landing (nominal)
03/25/09 — Soyuz TMA-14/18S launch
03/27/09 — Soyuz TMA-14/18S docking (DC1)
04/05/09 — Soyuz TMA-13/17S undocking
04/07/09 — Progress M-67/32P undocking & deorbit
05/15/09 — STS-127/Endeavour/2J/A launch – JEM EF, ELM-ES, ICC-VLD
05/25/09 — Soyuz TMA-15/19S launch
05/27/09 — Six-person crew on ISS (following Soyuz 19S docking)
07/30/09 — STS-128/Atlantis/17A – MPLM (P), last crew rotation
10/15/09 — STS-129/Discovery/ULF3 – ELC1, ELC2
12/10/09 — STS-130/Endeavour/20A – Node-3 + Cupola
02/11/10 — STS-131/Atlantis/19A – MPLM(P)
04/08/10 — STS-132/Discovery/ULF4 – ICC-VLD, MRM1
05/31/10 — STS-133/Endeavour/ULF5 – ELC3, ELC4 (contingency).

SpaceRef staff editor.