NASA ISS On-Orbit Status 12 December 2010

By SpaceRef Editor
December 13, 2010
Filed under , , ,
NASA ISS On-Orbit Status 12 December 2010
http://images.spaceref.com/news/exp26.jpg

All ISS systems continue to function nominally, except those noted previously or below. Sunday – Crew rest day. Ahead: Week 3 of Increment 26.

FE-1 Kaleri conducted the regular daily early-morning check of the aerosol filters at the Russian Elektron O2 generator which Maxim Suraev had installed on 10/19/09 in gaps between the BZh Liquid Unit and the oxygen outlet pipe (filter FA-K) plus hydrogen outlet pipe (filter FA-V). [Alex will inspect the filters again before bedtime tonight, currently a daily requirement per plan, with photographs to be taken if the filter packing is discolored.]

FE-2 Skripochka completed the routine daily servicing of the SOZh system (Environment Control & Life Support System, ECLSS) in the SM (Service Module), including the weekly collection of the toilet flush (SP) counter and water supply (SVO) readings for calldown to TsUP-Moscow. [This includes checking the ASU toilet facilities, replacement of the KTO & KBO solid waste containers and replacement of EDV-SV waste water and EDV-U urine containers].

FE-2 also performed the weekly checkup on the Russian POTOK-150MK (150 micron) air filter unit of the SM’s SOGS air revitalization subsystem, gathering weekly data on total operating time & “On” durations for reporting to TsUP.

CDR Kelly completed the regular bi-monthly reboots of the OCA Router & FS SSC (File Server Station Support Computer) laptops (the latter required to mitigate the problem of iPV and OSTPV not opening up procedures due to a memory leak in the “Tomcat” software). After a period of no less than 10 min later, the CDR also rebooted the two ISS network servers (SERVER1 & 2).

While waiting for the SERVER reboots, Scott moved to the Kibo JPM (JEM Pressurized Module) to switch on the PROX (Proximity Communication System) to support JAXA ground ops.

CDR & FE-2 had their weekly PFCs (Private Family Conferences) via S-band/audio and Ku-band/MS-NetMeeting application (which displays the uplinked ground video on an SSC laptop), Oleg at ~9:10am, Scott at ~12:00pm EST.

Jobs listed for Kaleri & Skripochka today on the Russian discretionary “time permitting” task list were –

* Another ~30-min. run of the GFI-8 “Uragan” (hurricane) earth-imaging program with the NIKON D3X digital camera photography with Sigma AF 300-800mm telelens, aiming for general views of glaciers and icebergs at Prince Edward island, Crozet Island, Kerguelen Island, Herd Island, icebergs in the area of Bouvetoya island along the far most ice limit, and Patagonia Southern Ice Field Glaciers,

* A ~30-min. session for Russia’s EKON Environmental Safety Agency, making observations and taking KPT-3 aerial photography of environmental conditions on Earth using the NIKON D3X camera with the RSK-1 laptop, and

* A ~15-min. photography session for the DZZ-13 “Seiner” ocean observation program, obtaining NIKON D3 photos with Nikkor 80-200 mm lens and the SONY HD video camcorder on oceanic color bloom patterns in the waters of South-Eastern Pacific., then copying the images to the RSK-1 laptop,

Scott Kelly’s discretionary “job jar” task list for today called for –

* The periodic R&R (removal & replacement) of the EDV-U container in the WHC (Waste & Hygiene Compartment), and

* The periodic ISS Ops Product Survey by US crews. [This evaluation should help MCC-Houston/MOD and the entire ISS Ops community across all IPs (International Partners) to better integrate the ops products used onboard on a daily basis (such as the Daily Summary, Stowage Notes, and Procedures). The standards described in the survey are not NASA-only but are also supposed to be followed by all USOS control centers (Houston, POIC, COL-CC, and SSIPC).]

The crew worked out on today’s 2-hr physical exercise protocol on the TVIS treadmill with vibration isolation & stabilization (FE-1, FE-2), ARED advanced resistive exercise device (CDR, FE-2), T2/COLBERT advanced treadmill (CDR), and VELO bike with bungee cord load trainer (FE-1).

Bone Calcium Loss: Tonight Scott Kelly starts the overnight fast for another dosing with the Bisphosphonates Alendronate pill protocol tomorrow morning. [Only plain water is allowed for ~10 hrs prior to dosing. The Bisphosphonates study should determine whether antiresorptive agents (that help reduce bone loss) in conjunction with the routine in-flight exercise program will protect ISS crewmembers from the regional decreases in bone mineral density documented on previous ISS missions.]

No CEO (Crew Earth Observation) targets uploaded today.

ISS Orbit (as of this morning, 7:41am EST [= epoch])
Mean altitude – 349.8 km
Apogee height – 355.0 km
Perigee height – 344.6 km
Period — 91.53 min.
Inclination (to Equator) — 51.65 deg
Eccentricity — 0.0007721
Solar Beta Angle — 14.0 deg (magnitude increasing)
Orbits per 24-hr. day — 15.73
Mean altitude loss in the last 24 hours – 75 m
Revolutions since FGB/Zarya launch (Nov. 98) – 69,152.

Significant Events Ahead (all dates Eastern Time and subject to change):
————–Three-crew operations————-
12/15/10 — Soyuz TMA-20/25S launch – Kondratyev (CDR-27)/Coleman/Nespoli (2:09pm)
12/17/10 — Soyuz TMA-20/25S docking (MRM1) (~3:09pm)
————–Six-crew operations————-
12/20/10 — SPDM (Robotics) Test
01/20/11 — HTV2 launch
01/21/11 — Russian EVA-27
01/24/11 — Progress M-08M/40P undock
01/27/11 — HTV2 berthing (Node-2 zenith)
01/28/11 — Progress M-09M/41P launch
01/31/11 — Progress M-09M/41P docking (DC1)
02/03/10 — STS-133/Discovery launch – ~1:34am — NET (no earlier than)
02/21/11 — Russian EVA-28
02/15/11 — ATV-2 “Johannes Kepler” launch
02/19/11 — Progress M-07M/39P undock
02/24/11 — HTV2 unberthing (Node-2 nadir)
02/26/11 — ATV-2 “Johannes Kepler” docking (SM aft)
03/16/11 — Soyuz TMA-01M/24S undock/landing (End of Increment 26)
————–Three-crew operations————-
03/20/11 — Soyuz TMA-21/26S launch – A. Borisienko (CDR-28)/R.Garan/A.Samokutayev
03/22/11 — Soyuz TMA-21/26S docking (MRM2)
————–Six-crew operations————-
04/01/11 — STS-134/Endeavour (ULF6 – ELC3, AMS-02) launch – ~3:15am — NET
04/26/11 — Progress M-09M/41P undock
04/27/11 — Progress M-10M/42P launch
04/29/11 — Progress M-10M/42P docking (DC1)
05/xx/11 — Russian EVA-29
05/16/11 — Soyuz TMA-20/25S undock/landing (End of Increment 27)
————–Three-crew operations————-
05/30/11 — Soyuz TMA-22/27S launch – M. Fossum (CDR-29)/S. Furukawa/S. Volkov
06/01/11 — Soyuz TMA-22/27S docking (MRM1)
————–Six-crew operations————-
06/04/11 — ATV-2 “Johannes Kepler” undock (SM aft)
06/21/11 — Progress M-11M/43P launch
06/23/11 — Progress M-11M/43P docking (SM aft)
08/29/11 — Progress M-11M/43P undocking
08/30/11 — Progress M-12M/44P launch
09/01/11 — Progress M-12M/44P docking (SM aft)
09/16/11 – Soyuz TMA-21/26S undock/landing (End of Increment 28)
————–Three-crew operations————-
09/30/11 — Soyuz TMA-23/28S launch – D.Burbank (CDR-30)/A.Shkaplerov/A.Ivanishin
10/02/11 – Soyuz TMA-23/28S docking (MRM2)
————–Six-crew operations————-
10/25/11 — Progress M-10M/42P undocking
10/26/11 — Progress M-13M/45P launch
10/28/11 — Progress M-13M/45P docking (DC-1)
11/16/11 — Soyuz TMA-22/27S undock/landing (End of Increment 29)
————–Three-crew operations————-
11/30/11 — Soyuz TMA-24/29S launch – O.Kononenko (CDR-31)/A.Kuipers/D.Pettit
12/02/11 — Soyuz TMA-24/29S docking (MRM1)
————–Six-crew operations—————-
12/??/11 — 3R Multipurpose Laboratory Module (MLM) w/ERA – on Proton.
12/26/11 — Progress M-13M/45P undock
12/27/11 — Progress M-14M/46P launch
12/29/11 — Progress M-14M/46P docking (DC-1)
03/05/12 — Progress M-12M/44P undock
03/16/12 — Soyuz TMA-23/28S undock/landing (End of Increment 30)
————–Three-crew operations————-
03/30/12 — Soyuz TMA-25/30S launch – G.Padalka (CDR-32)/J.Acaba/K.Valkov
04/01/12 — Soyuz TMA-25/30S docking (MRM2)
————–Six-crew operations—————-
05/15/12 — Soyuz TMA-24/29S undock/landing (End of Increment 31)
————–Three-crew operations————-
05/29/12 – Soyuz TMA-26/31S launch – S.Williams (CDR-33)/Y.Malenchenko/A.Hoshide
05/31/12 – Soyuz TMA-26/31S docking
————–Six-crew operations—————-
09/09/12 — Soyuz TMA-25/30S undock/landing (End of Increment 32)
————–Three-crew operations————-
09/23/12 — Soyuz TMA-27/32S launch – K.Ford (CDR-34)/O. Novitskiy/E.Tarelkin
09/25/12 – Soyuz TMA-27/32S docking
————–Six-crew operations————-
10/07/12 — Soyuz TMA-26/31S undock/landing (End of Increment 33)
————–Three-crew operations————-
11/xx/12 — Soyuz TMA-28/33S launch – C.Hadfield (CDR-35)/T.Mashburn/R.Romanenko
11/xx/12 – Soyuz TMA-28/33S docking
————–Six-crew operations————-
03/xx/12 — Soyuz TMA-27/32S undock/landing (End of Increment 34)
————–Three-crew operations————-
03/xx/12 – Soyuz TMA-29/34S launch.
03/xx/12 – Soyuz TMA-29/34S docking
————–Six-crew operations————-

To send holiday greetings to the crew and get more information about the space station, visit http://www.nasa.gov/station.