Status Report

NASA ISS On-Orbit Status 11 July 2013

By SpaceRef Editor
July 11, 2013
Filed under , , ,
NASA ISS On-Orbit Status 11 July 2013
NASA ISS On-Orbit Status 11 July 2013

New Status: USOS Extravehicular Activity (EVA) #23 Preparations: In preparation for USOS EVA #23, planned for next Tuesday, July 16, all three USOS crew members participated in a Dynamic Onboard Ubiquitous Graphics (DOUG) software review. They also reviewed the timeline, briefing package and cribsheet, followed by a conference with ground teams. Flight Engineer (FE)-5 Parmitano replaced Long Life Batteries (LLB) and Metal Oxide (METOX) in his and FE-3 Cassidy’s suits.

Waste and Hygiene Compartment (WHC) Urine Receptacle Remove and Replace (R&R): Cassidy completed this routine maintenance consisting of WHC urine receptacle and insert filter R&R followed by a functionality test.

Countermeasures System (CMS) Periodic Fitness Evaluation (PFE): Nyberg performed her monthly PFE with assistance from Parmitano as Crew Medical Officer (CMO). The evaluation is to monitor crewmembers’ overall fitness levels to ensure that cardiovascular and musculoskeletal health and performance is satisfactory. This is a graded exercise test on the Cycle Ergometer with Vibration Isolation and Stabilization (CEVIS).

False Fire Alarms in Mini Research Module (MRM)-2 and Functional Cargo Block (FGB): This morning, a fire alarm initiated in MRM2. The crew confirmed there was no fire and ground controllers reconfigured systems back to their nominal configurations. After the fire alarm annunciated, the crew was initially unable to hear Space to Ground audio in the Russian Segment. Engineering teams are gathering data on the audio configuration to determine the cause. Later in the day, another fire alarm annunciated in the FGB. The crew again confirmed that there was no fire. Audio communication with the crew was nominal following the second false fire alarm.

Today’s Planned Tasks

Laptop RS2(1) Reboot [Complete]
VIRU. FSS PL Battery Charge (start) / r/g 2857 [Complete]
Regeneration of БМП Ф2 Micropurification Cartridge (start) [Complete]
Reaction Self Test [Complete]
EKAM Battery Swap [Complete]
SM ПСС (Caution & Warning Panel) Test [Complete]
Reboot Laptop RSS1, RSS2 / r/g 1009 [Complete]
Daily Planning Conference (S-band) [Complete]
PAO Hardware Setup [Complete]
Water Process Assembly (WPA) Waste Water Tank Offload to CWC [Complete]
Crew Prep for TV Conference / r/g 2869 [Complete]
Periodic Fitness Evaluation – Nom Ops (subject) [Complete]
TV Conference with the International Youth Science School “Space Research: Theory and Practice r/g 2869 [Complete]
Periodic Fitness Evaluation – Nom Ops (assistance) [Complete]
ТКГ 418 (DC1) Stowage and IMS Ops / r/g 2814 [Complete]
ESA Weekly Crew Conference [Complete]
VIRU. Software Upgrade. r/g 2870 [Complete]
Terminate Waste Water Tank Offload [Complete]
BCAT – Camera Battery Changeout [Complete]
Waste and Hygiene Compartment (WHS) Urine Receptacle and Insert Filter Changeout [Complete]
VIRU. Conduct the experiment r/g 2870 [Complete]
СТТС Configuration for MRM2 / Communications System [Complete]
KULONOVSKIY KRISTALL. Experiment Ops. r/g 2864 [Complete]
VIRU. Fill out and Downlink VIRU Log Sheet / r/g 2870 [Complete]
ТК 708 Kazbek Fit Check [Complete]
Flow water from through MRF [Complete]
MRM2 Comm Reconfig for Nominal Ops / Communication System [РТК], [Complete]
KULONOVSKIY KRISTALL. Copy and Downlink Data via РСПИ / r/g 2864 [Complete]
IDENTIFIKATSIYA. Copy ИМУ-Ц micro-accelerometer data to laptop / r/g 1813 [Complete]
OBSTANOVKA. Connecting ПВК in lieu of Cardiomed hardware r/g 2865 [Complete]
DOUG Software Review [Complete]
VYNOSLIVOST. Installation of Replaceable Samples on Panel No. 1. r/g 2863 [Complete]
Monitoring Hull Surfaces of RS Structural Elements using МВП-2К device. r/g 2859 [Complete]
PAO Hardware Setup [Complete]
Crew Prep for PAO [Complete]
PAO Event [Complete]
Installation of METOX and batteries into EMU [Complete]
EKAM Battery Swap [Complete]
Final printout of EVA procedures [Complete]
EVA2 Procedure Review [Complete]
Start BSA Battery Charge [Complete]
Monitoring RS Structural Shell Surfaces Using МВП-2К Device r/g 2859 [Complete]
EVA2 Procedure Review [Complete]
IMS Update [Complete]
Counter Measure System (CMS) Harmful Contaminant Measurements in SM / r/g 1955 [Complete]
Photo/TV Camcorder Setup Verification [Complete]
СОЖ Maintenance [Complete]
EVA Procedure Conference [Complete]
Gather Equipment, Work Area, and Procedure Review for R&R of Replaceable Assembly Panel (ПАС) in MRM2 [Complete]
VZAIMODEISTVIYE Experiment Ops / r/g 2370 [Complete]
БМП Ф2 Absorption Cartridge Regeneration (termination) [Complete]
Stow Video Equipment Used for ARED Exercise Video [Complete]
Daily Planning Conference (S-band) [Complete]
EKAM Battery Swap [Complete]
Reaction Self Test [Complete]
Task List

CEO Ops [Complete]
WHC EDV R&R
Roscosmos Report
Uragan Photo
Ekon Photo
BCAT C-1 Sample mix [Complete]
EVA Wanted Poster print [Complete]
WRS hose label [Complete]
Ground

Nominal Commanding
Three-Day Look Ahead:
Friday, 7/12: ITCS samples, EVA tool config, ACE sample prep, T2 monthly inspect
Saturday, 7/13: Crew day off
Sunday, 7/14: Crew day off

QUICK ISS Status – Environmental Control Group:

Component – Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full up

SpaceRef staff editor.