NASA ISS On-Orbit Status 10 June 2013
International Space Station (ISS) Management Center (IMC) Daily Summary Report
Increment 36 Operations – Stage 36-6
06/10/13 4:00 pm Central Daylight Time (CDT)
161/21:00 Greenwich Mean Time (GMT)
New Status: Light Microscopy Module (LMM) Configuration: Flight Engineer (FE)-3 Cassidy completed the LMM reconfiguration for the next use of the Fluids and Combustion Facility (FCF) for the Advanced Colloids Experiment (ACE) payload. Cassidy bent a pin on the microscope to reduce the clearance issues in the Z-axis, installed the LMM X-Y Stage, LMM objective lenses, Preliminary Advanced Colloids Experiment (PACE) Light Emitting Diode (LED) Base, ACE Sample, and Constrained Vapor Bubble (CVB) Surveillance Camera inside the LMM AFC (Auxiliary Fluids Container). Following ground checkout of the microscope configuration the crew will install the ACE sample on Tuesday.
ISS Emergency On-Board Training (OBT): The entire Expedition 36 crew as well as Mission Control Center (MCC)-Houston and MCC-Moscow performed an Emergency OBT. The scenario was based on a simulated rapid depress event. The ground teams subsequently debriefed the Emergency OBT with the Crew.
51 Progress (P) Hatch Closure and Leak Checks: CDR Vinogradov and FE-4 Yurchikhin removed the clamps then closed the hatches between 51P and SM Aft. They also performed vestibule and hatch leak checks. These activities were in preparation for undock scheduled for tomorrow at 8:59 a.m. CDT.
Russian GPS Receiver [ACH-M] Failure: Ground controllers received a notification that SM [ACH-M] Navigation Receiver Module-3 [НПМ-3] failed and was confirmed by Russian specialists. Only one НПМ is needed for docking Automated Transfer Vehicle (ATV)-4, however for redundancy and to ensure that at least one НПМ is available, two working units are required per the Flight Rule. On May 21, НПМ-4 was reported failed. The crew recabled the system such that НПМ-1 and НПМ-3 were available for use for ATV4 docking, scheduled for Saturday, June 15. Russian specialists and designers are working on troubleshooting steps and developing forward plans.
Today’s Planned Tasks
– PLASMA CRYSTAL. Pressure monitoring [Complete]
– HRF- sampling and sample stowage [Complete]
– HRF- sampling [Complete]
– HRF- urine specimen transfer to MELFI [Complete]
– HRF- urine specimen transfer to MELFI [Complete]
– PROK-urine specimen collection [Complete]
– HRF- urine specimen collection [Complete]
– ATV Rendezvous and Docking Timeline Drill. [Complete]
– HRF- urine specimen transfer to MELFI [Complete]
– HRF- blood sampling and centrifuge activation [Complete]
– HRF- blood sampling operator [Complete]
– HRF- refrigeration centrifuge configuration [Complete]
– BCAT- transfer of imagery from camera [Complete]
– Tear-down of Local Temp Switch (ТА251М1Б) and ROM on Progress 419 (SM Aft). [Complete]
– HRF- removal of sample from centrifuge and centrifuge deactivation [Complete]
– LMM- experiment procedure review [Complete]
– On MCC GO СРВК-2М multi-filtration unit (MFU) swap-out [Complete]
– HRF- sample transfer to MELFI [Complete]
– FIR – opening of rack doors [Complete]
– Prep of suit consumables, ancillary and personal gear. [Complete]
– LMM- hardware prep for experiment [Complete]
– Comm config for experiment ops out of MRM2 [Complete]
– PLASMA CRYSTAL. Hardware activation and experiment start. [Complete]
– PLASMA CRYSTAL. Start, monitoring, experiment start. TV (Б-Ц) [Complete]
– PLASMA CRYSTAL. TV signal monitoring on VKU [Complete]
– Start of NASA MPEG2 Viewer app on CP SSC laptop, mpeg2 multicast video stream monitoring [Complete]
– PLASMA CRYSTAL. Experiment photo imagery [Complete]
– Onboard computer system antivirus database update [Complete]
– Daily biorhythm ops [Complete]
– PLASMA CRYSTAL. Experiment termination. [Complete]
– IMS Data Update [Complete]
– PLASMA CRYSTAL. Data transfer from HDD [Complete]
– RGN REC-TNK – removal of pressure relief hose for nominal ops. [Complete]
– Comm reconfig to nominal following MRM2 ops [Complete]
– FIR- closing rack doors [Complete]
– Termination of BSA charge [Complete]
– ATV rendezvous and docking contingency drill [Complete]
– Crew adjustment and familiarization time [Complete]
– Integrated emergency response drill. [Complete]
– PWD – potable water mouthpiece cleaning [Complete]
– PROK- photo imagery and data transfer [Complete]
– Prep of suit consumables, ancillary and personal gear. [Complete]
– HRF- refrigerator centrifuge and hardware setup [Complete]
– PAO crew prep [Complete]
– EXPR7- panel closure [Complete]
– СОЖ Maintenance [Complete]
– Progress 419 (SM Aft) Activation, airduct tear-down [Complete]
– CIR- equipment tear-down [Complete]
– Integrated emergency response drill – ISS Crew/MCC debrief (S-band) [Complete]
– Removal and inspection of quick-disconnect clamps on SM Aft side [Complete]
– Toilet Section – urine adapter and insert swap-out [Complete]
– HRF- urine specimen collection [Complete]
– ПрК-СУ/ТКГ-СУ hatch closure for Progress 419 (SM Aft) [Complete]
– HRF-urine sample transfer to MELFI [Complete]
– HRF- post-experiment equipment stow [Complete]
– Leak check post-ПрК-СУ/ТКГ-СУ hatch closure for Progress 419 (SM Aft) [Complete]
– SM/Progress 419 (SM Aft) Interface TV imagery downlink (Ku-band) [Complete]
– PLASMA CRYSTAL. Pressure monitoring [Complete]
– PFE reminder review [Complete]
Task List
– Crew handover [In Work]
– PTV Audit Pt 5 [Complete]
– HRM Delete Stow [Complete]
– ESA Record Video Message [Complete]
– P/TV EVA Camera Reconfig [Complete]
– PMM Rack Labels [Complete]
– RS EVA Tool Gather [Complete]
– WHC KTO replace
– WHC EDV R&R
– Preparation of reports for Roskosmos site
– ECON-M. Observations and Photography
– URAGAN Observations and Photography
– ARED Upper Stop [Complete]
– ARED VIS Tether R&R [Complete]
– CSD Holder Check [In Work]
– Controller Sleeve Locate [In Work]
– EVA On-Orbit Measurement/Fit Check
– N2 Spare Tools Audit
– Payload Trash Gather
Ground
Nominal Commanding
Three-Day Look Ahead:
Tuesday, June 11: 51P undocking, PFE, RS EVA 33 Prep, ACE sample install
Wednesday, June 12: Crew Off duty – Russia Day
Thursday, June 13: RS EVA Tool Gather, MSG AAA Fan Cleaning, CFE Ops
QUICK ISS Status – Environmental Control Group:
Component Status
Elektron – On
Vozdukh – On
[СКВ] 1 – SM Air Conditioner System (“SKV1”) – On
[СКВ] 2 – SM Air Conditioner System (“SKV2”) – Off
Carbon Dioxide Removal Assembly (CDRA) Lab – Standby
Carbon Dioxide Removal Assembly (CDRA) Node 3 – Operate
Major Constituent Analyzer (MCA) Lab – Off
Major Constituent Analyzer (MCA) Node 3 – Operate
Oxygen Generation Assembly (OGA) – Process
Urine Processing Assembly (UPA) – Standby
Trace Contaminant Control System (TCCS) Lab – Off
Trace Contaminant Control System (TCCS) Node 3 – Full Up
Meeting Schedule: Meeting Day Date Houston Time (CDT)
IMMT Thursday June 13 8:00 a.m.